My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Forma Construction 7/15/2019
>
Contracts
>
6 Years Then Destroy
>
2019
>
Forma Construction 7/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:32:02 AM
Creation date
8/1/2019 10:31:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Forma Construction
Approval Date
7/15/2019
End Date
9/30/2019
Department
Facilities
Department Project Manager
Mike Palacios
Subject / Project Title
Use of City Property at 1st Place W
Tracking Number
0001938
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CG 25 03 05 09 <br /> B. For all sums which the insured becomes legally C. When coverage for liability arising out of the <br /> obligated to pay as damages caused by "products-completed operations hazard" is provided, <br /> "occurrences" under Section I — Coverage A, and for any payments for damages because of "bodily <br /> all medical expenses caused by accidents under injury" or "property damage" included in the <br /> Section I — Coverage C, which cannot be attributed "products-completed operations hazard" will reduce <br /> only to ongoing operations at a single designated the Products-completed Operations Aggregate <br /> construction project shown in the Schedule above: Limit, and not reduce the General Aggregate Limit <br /> nor the Designated Construction Project General <br /> 1. Any payments made under Coverage A for Aggregate Limit. <br /> damages or under Coverage C for medical <br /> expenses shall reduce the amount available D. If the applicable designated construction project has <br /> under the General Aggregate Limit or the been abandoned, delayed, or abandoned and then <br /> Products-completed Operations Aggregate restarted, or if the authorized contracting parties <br /> Limit, whichever is applicable; and deviate from plans, blueprints, designs, <br /> specifications or timetables, the project will still be <br /> 2. Such payments shall not reduce any Designated deemed to be the same construction project. <br /> Construction Project General Aggregate Limit. E. The provisions of Section III — Limits Of Insurance <br /> not otherwise modified by this endorsement shall <br /> continue to apply as stipulated. <br /> CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.