Laserfiche WebLink
6/4/2019 Page 1 <br /> City of Everett <br /> 1:36:48PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1902-090 Site Address 2201 COLUMBIA AVE <br /> Applied 2/21/2019 Applicant Lot <br /> Approved 2/21/2019 Owner HAALAANNAR Block <br /> Issued 2/21/2019 Contractor SMART ENERGY TODAY INC(ELEC) Tract <br /> Parent Permit No. Description SERVICE CHANGE,REPLACE METER,MAST,PANEL <br /> Notes ELECTRICAL PANEL WITH NEW OUTDOOR LOAD CENTER <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 3/1/2019 3/1/2019 ELEC 09-FINAL SKB CORRECTION 360-6374343 ext 2424 <br /> Brennan Barnes 360-791-5416 Installer <br /> (3/1/2019 1:30 PM SKB) <br /> Installer fused disconnect with 40 amp <br /> fuses per one line diagram. <br /> 3/1/2019 3/1/2019 ELEC 05-SERVICE SKB PARTIALAPPR (3/1/2019 1:30 PM SKB) <br /> Install a second strap on the mast per WAC <br /> 296-46B-230-028(4)(b). <br /> 3/7/2019 3/7/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> 3/7/2019 3/7/2019 ELEC 09-FINAL SKB APPROVAL Phone:360-637-4343 <br /> INSP12 COWS YS TE M S <br />