Laserfiche WebLink
INSPECTION REPORT <br /> Date Permit: g f 90 ) - it,3 <br /> Contractor: <br /> Owner: <br /> Site Address: _3Q_/ Coti4tuel2 cci-C. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground LI Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ['Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Groundin. ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> PI Ing rid ❑Drywall Nailing ❑Plumbing Final <br /> fir Electrical Final ❑Shear Nailing GAS PIPE <br /> 11TE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> • oo Ing *rains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL T - - <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> Li CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: (91/7 <br /> EIR(10/06) DATABAR,INC. <br />