Laserfiche WebLink
WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required,select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii, iii,or v) is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3)Electrical plan review. <br /> ® (a)Electrical plan review is not required for: <br /> ❑ (i) Low voltage systems; <br /> 4---0 (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> ❑ (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> o does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> ❑ (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> ❑ rating of 9600 watts or less. <br /> (vii)For installations in (a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> ® (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care <br /> occupancies defined in this chapter. <br /> 0 (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table.PM/ T'a o l e 9130,2 <br /> Health ar PersonaBare FAciFiYies Educational and institutional Facilities.iP€aces of Assernb y.or Other Facilities <br /> Hmitre,,r Personal Care Facility Plan Review Educational. ?nstirutionai.or IPlan Review <br /> type Required <br /> ,, Other Facility Types ttecq-aired <br /> );' _ i-- t3m.ni.n[knrinnp-reive Yes -_ct;tatci al de_ <br /> f!nets ttrtt <br /> Pe weln'r'+-.'•nr Yes <br /> •+..�'.YtcWe!i=`c�}n fat7li?;+,• Yes <br /> b.+arfl elrehr,is.»+hn.sPltai yes Notes to Ta bfes 500-1 anr:3C0.2: <br /> a r iv3t+ n e hi'ir1?c:tsn.+faits") Yes city a 1.^c ri``_d to it c'ti,:tr ca. „5p *..7.,r <br /> +1, nen-, Yes ray reot,,rs p a.."'E,e.N ticst e._ <br /> -.r„iuisroy!3Urgq*y facility Yes re":ewe diy*.eo_,a-err e^t, <br /> 4xriil•s'i+,,.pst}rifd�j Gi34ii,,I4 Yes <br /> u _,Its::nt gt t,noti'eer*t fatuity Yes <br /> t ia4ketl iet Vivitaalry Yes r I f," <br /> vt�hya r`vwtl,rre`*.abIlitacior+ Yes PERMIT# 1 Paget-Plan Review <br />