Laserfiche WebLink
Review Reply Letter Aug 3,2017 <br /> To Everettt Engineering Public Services <br /> Jeff Heilman—Development Technician <br /> 3200 Cedar St, Everett,Wa 98201 <br /> 425 257-8810—425 257-8976 <br /> Re: McNeil 3410 Oakes Ave <br /> Plan Check Number:C1705-009 <br /> Review Letter dated: 7/26/2017 <br /> Structural—see reply letter from Upstate Engineering dated 8/1/2017 <br /> 1. <br /> 2. I see no references to SW edge nailing>6"to remove <br /> 3.A note referencing"Balloon Frame" indicated/clouded on A3 First Floor Plan <br /> Architectural <br /> 4. R-10 perimeter notes updated/clouded, indicating R-10 ILO R-5 on A2 Fnd,and A3 First Floor Plan.A <br /> new detail for interior wall thermal break added/clouded on A3. <br /> S.The existing section drawing at the Deck has been updated/clouded on A3 with new call out number <br /> Detail 18 showing rail/deck/flashing construction along with 2 drainage openings(each end) <br /> 6. Deck drainage indicated on Section A3/18 and First Floor Plan A3 as(2)3"x8"openings flashed with <br /> drip flashing. <br /> 7.Attic ventilation was indicated in(2) locations(Al notes&calculations of area required,and A3 Roof <br /> Plan).Duplicate notes added/clouding indicating that ALL ridges will have Continuous Ridge vents and <br /> ALL soffits will be vented. <br /> 8.WSEC was indicated in(2)locations(A3 First Floor Plan)and A7 WSEC sheet)as being satisfied by 5c— <br /> Heat Pump HW heater with EF:2.0.An installation detail and more notes were added/clouded on A3. <br /> Thank you <br /> Doug Williams <br /> Designer <br /> 425 530-1042 <br />