Laserfiche WebLink
5/10/2019 Page <br /> City of Everett <br /> 9:27:09AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1705-007 Site Address 625 PECKS DR <br /> Applied 5/18/2017 Applicant Lot <br /> Approved 5/18/2017 Owner SEATTLE ZEPHYR INC Block <br /> Issued 5/18/2017 Contractor OWNER Tract <br /> Parent Permit No. BW 1806-002 Description REPLACE PLUMBING FIXTURES&EXHAUST FANS <br /> Notes SUBJECT TO FIELD INSPECTION <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 6/26/2017 6/26/2017 PlbgRoughln SDP Approval As noted 1.Groundwork OK to cover. <br /> 2.Rough in OK as noted: <br /> Do all vents penetrating the roof have <br /> proper flashing? <br /> At the final-water heater must be up to <br /> code(remove flex on temp/pressure drain <br /> line,straps,etc.) <br /> 6/26/2017 6/26/2017 PlbgGrWork SDP Approval As noted 1.Groundwork OK to cover. <br /> 2.Rough in OK as noted: <br /> Do all vents penetrating the roof have <br /> proper flashing? <br /> At the final-water heater must be up to <br /> code(remove flex on temp/pressure drain <br /> line,straps,etc.) <br /> 7/6/2017 7/6/2017 Mech Other SDP Other Unable to inspect 1.Plumbing approved 6/26/17. <br /> 2.Mechanical is not ready. <br /> 3.If you were looking for electrical <br /> inspection,please recall the inspection <br /> using the electrical permit number-this <br /> permit number is for plumbing/mechanical. <br /> 5/17/2018 5/17/2018 ADMIN OTHER KLC OTHER Expired permit,14 <br /> day grace period <br /> 6/14/2018 6/14/2018 PERMIT TKJ APPROVAL <br /> EXTENSION <br /> 10/8/2018 10/8/2018 PERMIT CRB APPROVAL OK PER TED <br /> EXTENSION <br /> 10/17/2018 10/17/2018 MECH 04-ROUGH SDP CORRECTION 1.Stove hood exhaust is not installed. <br /> IN 2.How do you plan to heat this house? <br /> Contact a design professional to help you <br /> with this.You must meet both energy code <br /> and building code requirements. <br /> 10/18/2018 10/18/2018 MECH 04-ROUGH SDP APPROVAL As noted 1.Stove exhaust will be on the outside wall <br /> IN and shall be installed for final approval. <br /> 2.The house will be heated using baseboard <br /> electrical heat. <br /> 4/24/2019 4/24/2019 PLUMB 06-FINAL SDP CORRECTION (4/24/2019 2:31 PM SDP) <br /> Complete the corrections written on <br /> 6-26-17. <br /> 1)Install a roof jack on the new 2"vent <br /> pipe penetrating the roof. <br /> 2)complete the water heater and bring <br /> straps and T&P line up to code.No flex and <br /> must drain to the outside at proper height. <br /> 4/24/2019 4/24/2019 MECH 06-FINAL SDP APPROVAL <br /> 5/3/2019 5/3/2019 PLUMB 06-FINAL SDP APPROVAL <br /> 5/3/2019 5/3/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRW'SYSTEM <br />