Laserfiche WebLink
INSPECTION REPORT <br /> li:F_ Date Permit: / I/ —/ F6_ _— — <br /> Contractor: <br /> Owner: <br /> Site Address: 'j 306 — 3 15 r T <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ■..•• .t..rid ❑Drywall Nailing ❑Plumbing Final <br /> NI - trica Final ❑Shear Nailing GAS PIPE <br /> SITE WO' ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> IN _. g drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> •' ,•R C.O. ❑ VIOLATION <br /> 4 ,AB TO PERFORM INSPECTION: <br /> i <br /> `; 425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: 44009 <br /> EIR(10/06) DA ABAR,INC. <br />