Laserfiche WebLink
2/22/2019 Page 1 <br /> City of Everett <br /> 11:54:10AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M1902-008 Site Address 604 34TH ST <br /> Applied 2/6/2019 Applicant GREENWOOD HEATING AND AC Lot <br /> Approved 2/7/2019 Owner ROHLINGER GARY E Block <br /> Issued 2/11/2019 Contractor GREENWOOD HEATING AND AC Tract <br /> Parent Permit No. \ Description BOILER INSTALL <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 2/15/2019 Any 2/15/2019 MECH 06-FINAL SDP OTHER inspection cancelled 2/12/2019 8:04 AM GREENWOOD <br /> HEATING AND AC <br /> Requested boiler inspection for late AM <br /> arrival.Please call project manager matt of <br /> ETA.425 766 0775.Thank you! <br /> Contact Name:Matt <br /> Site Address:604 34TH ST <br /> Phone:4257660775 <br /> e-Mail:permits@greenwoodheating.com <br /> 2/12/2019 7:45 AM GREENWOOD <br /> HEATING AND AC <br /> REQUESTED LATE AM INSPECTION, <br /> ALSO REQUESTED CALL,MATT 425 <br /> 766 0775 <br /> Contact Name:GREENWOOD HEATING <br /> AND AC <br /> Site Address:604 34TH ST <br /> Phone:2067841818 <br /> e-Mail:kauliev@greenwoodheating.com <br /> (Canceled-eTRAKiT-2/12/2019 8:03:24 <br /> AM) <br /> 2/20/2019 2/20/2019 MECH 06-FINAL SDP APPROVAL As noted 2/19/2019 7:34 AM GREENWOOD <br /> HEATING AND AC <br /> REQUESTED AM INSPECTION,ALSO <br /> REQUESTED CALL,MATT 425 766 0775 <br /> Contact Name:GREENWOOD HEATING <br /> AND AC <br /> Site Address:604 34TH ST <br /> Phone:2067841818 <br /> e-Mail:kauliev@greenwoodheating.com <br /> (2/20/2019 2:35 PM SDP) <br /> Adjust the combustion air termination so <br /> that it is a min.of 12"above the <br /> surrounding ground. <br /> Tape the copper pipe where it touches the <br /> metal unistrut brackets. (Dissimilar metals) <br /> 2/20/2019 2/20/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> INSP12 CifillfsYSTEMS <br />