Laserfiche WebLink
L 1��:1' � . , <br /> ISSUE LEGEND <br /> NOT YET ISSUED <br /> INCLUDED <br /> IN SET O PREVIOUSLY ISSUED, <br /> SHEET N0. SEQ. N0. DRAWING TITLE REV DATE NOT IN THIS ISSUE <br /> GEN ER A� <br /> GO GO COVER SHEET, CODE INFORMATION ORIG 07.02.18 <br /> G1 G1 INDEX OF DRAWINGS ORIG 07.02.18 <br /> G2 G2 SYMBOLS, ABBREVIATIONS, GENERAL NOTES ORIG 07.02.18 ORIG ORIGINAL ISSUE <br /> FOR PERMIT, BID, <br /> G3 G3 TECHNICAL SPECIFICATIONS ORIG 07.02.18 PROCUREMENT OR <br /> A R C H TE C TU R A� CONSTRUCTION <br /> � 40-023-M1A29R A1 PARTIAL MEZZANINE REMOVAL PLAN ORIG 07.02.18 <br /> � 40-030-M1A11 R A2 PARTIAL MEZZANINE REMOVAL PLAN ORIG 07.02.18 A DRAWING REVISION - ' <br /> � 40-037-1A15R A3 PARTIAL FIRST FLOOR REMOVAL PLAN ORIG 07.02.18 SEE SPECIFIC DRAWING <br /> . FOR NATURE OF <br /> 40-023-M1A29 A4 PARTIAL MEZZANINE FLOOR P�AN A 07.02.18 REVISION <br /> 40-030-M1A11 A5 PARTIAL MEZZANINE FLOOR PLAN C 07.02.18 <br /> 40-037-1A15 A6 PARTIAL FIRST FLOOR PLAN E 07.02.18 <br /> 40-023-A399 A7 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> 40-030-A374 A8 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> � 40-037-A376 A9 INTERIOR ELEVATIONS ORIG 07.02.18 <br /> 40-023-A467 A10 ENIARGED PLANS - MEZZANINE ORIG 07.02.18 <br /> 40-030-A451 A11 ENLARGED PLANS - MEZZANINE ORIG 07.02.18 <br /> 40-037-A505 Al2 ENLARGED PLANS - FIRST FLOOR ORIG 07.02.18 <br /> A501 A13 DETAILS ORIG 07.02.18 <br /> � A502 A14 SECTIONS AND DETAILS ORIG 07.02.18 <br /> Nl ECH Af� I CA� <br /> � 40-SITE-MO MO RESTROOM LOCATION KEY PLANS ORIG 07.02.18 <br /> 40-SITE-M 1 A M 1 HVAC LEGEND ORIG 07.02.18 <br /> 40-SITE-M1 B M2 PIPING LEGEND ORIG 07.02.18 <br /> 40-SITE-M2 M3 MECNANICAL SPECIFICATIONS ORIG 07.02.18 <br /> • 40-SITE-M2-1 M4 MECHANICAL SCHEDULES & TYPICAL DETAILS ORIG 07.02.18 <br /> 40-023-M1M129R M5 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 40-030-M1 M111 R M6 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 40-037-1 M115R M7 PARTIAL FIRST FLOOR PLUMBING PLAN B 07.02.18 <br /> 40-023-M1 M29 M8 PARTIAL MEZZANINE HVAC PLAN A 07.02.18 <br /> 40-023-M1M129 M9 PARTIAL MEZZANINE PLUMBING PLAN A 07,02.18 <br /> • 40-030-M1M11 M10 PARTIAL MEZZANINE NVAC PLAN A 07.02.18 <br /> 40-030-M1 M111 M11 PARTIAL MEZZANINE PLUMBING PLAN A 07.02.18 <br /> 140-30-4501 -P-11 TOILET PLAN (REFERENCE ONLY) L 08.19.02 <br /> 40-037-1 M 15 M 12 PARTIAL FIRST FLOOR HVAC PLAN B 07.02.18 <br /> 40-037-1 M115 M13 PARTIAL FIRST FLOOR PLUMBING PLAN B 07.02.18 <br /> 40-037-OM115 PLUMBING BASEMENT PLAN AREA 15 REFERENCE ONLY 03.94 <br /> E�ECTRI CA� <br /> � EOA E1 ELECTRICAL LEGEND & ABBREVIATIONS K 07.02.18 <br /> 40-023-M1 E29R E2 LIGHTING - REMOVAL A 07.02.18 <br /> 40-023-M1 E79R E3 208Y 120 VOLT POWER - REMOVAL A 07.02.18 <br /> 40-030-M1 E11 R E4 PARTIAL LIGHTING PLAN - REMOVAL B 07.02.18 <br /> 40-030-M1 E61 R E5 PARTIAL 208Y 120 VOLT POWER PLAN - REMOVAL ORIG 07.02.18 <br /> 40-037-1 E15R E6 FIRST FLOOR LIGHTING PLAN - REMOVAL F 07.02.18 <br /> • 40-037-1 E65R E7 PARTIAL 1 ST FLOOR 120 208V PWR PLN - REMOVAL E 07.02.18 <br /> 40-023-M1 E29 E8 LIGHTING A 07.02.18 <br /> 40-023-M1 E79 E9 208Y 120 VOLT POWER A 07.Q2.18 <br /> 40-023-E500 E10 FLUSH VALVE AND FAUCET POWER DETAILS ORIG <br /> • 40-030-M1 E11 E11 PARTIAL LIGHTING PLAN B 07.02.18 <br /> 40-030-M1 E61 E12 PARTIAL 208Y 120V POWER PLAN ORIG 07,02.18 <br /> � 40-030-E500 E13 FLUSH VALVE AND FAUCET POWER DETAILS ORIG <br /> 40-037-1 E15 E14 FIRST FLOOR LIGHTING PLAN F 07.02.18 <br /> E15 NOT USED <br /> 40-037-1 E65 E16 PARTIAL 1 ST FLOOR 120 208V POWER PLAN E 07.02.18 <br /> 40-037-E500 E17 FLUSH VALVE AND FAUCET POWER DETAILS ORIG 07.02.18 <br /> W5741115 <br /> buffalod gn PHASE 1 RENOVATION PACKAGE <br /> architecture � interiors IFC SUBMITTAL <br /> 1520fourfh ave <br /> suite 400 07.02.18 <br /> seattle,wa <br /> 98101 <br /> 206 467 6306 � <br /> buffalodesign.com <br /> � <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE � <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED oATE ac c E P-raB���-r� I N D EX 0 F D RAW I N G S W5741115 0 R I G 07.02.18 � <br /> ORIG WORKPLACE ENVIRONMENT INVESTMENT W5741115 BUFFALO 07.02.18 sg�s REGISTERED THIS DESIGN AND/OR CHECKED � <br /> ARCHITECT SPECIFICATION IS APPROVED SHEET N <br /> � ENGINEER TITLE WORKPLACE ENVIRONMENT INVESTMENT � � � <br /> , C ���� APPROVED BY DEPT. DATE � <br /> � %� CHECKED �- <br /> CHRISEDWARD�oN APPROVED �UILDING 40�023��O�o�o��or0� ! JOB N0. COMP N0. � <br /> STATE OF WASHINGTON W5741115 <br /> APPROVED ARCHITECTURAL MASTER COL. N/A EVERETT, Wq °wc No. G1 <br />