Laserfiche WebLink
412 <br /> March, 15th, 2019 <br /> To: James Bronder, P.E., S.E. <br /> Associate Engineer <br /> Plans Examiner <br /> City of Everett <br /> Correction Letter <br /> RE: Building Permit Review Letter <br /> Dear Mr. Bronder, <br /> In response to the Plan review comments, the plans have been examined and revised per your <br /> comments in order to receive approval for a building permit. Please see the response to your <br /> comments below. <br /> Architectural 1. <br /> City Comment: <br /> 1. On Sheet A1.1, the proposed cooler box appears to increase the fire area of the existing <br /> building. Previous records appear to indicate that the existing structure is a nonsprinkler'd, Type <br /> 5B structure with a B Occupancy. Per IBC 2015 506.2, the total area of proposed area and <br /> existing area appears to exceed the allowable area threshold of a nonsprinkler'd building. <br /> Please provide details indicating a proposed sprinkler system is to be installed or indicate via <br /> details an alternate means of providing fire separation between the two areas. <br /> Answer: <br /> The 2-hr fire separation between the existing warehouse facility and the new cooler box is <br /> accomplished by the existing 8" thick cmu exterior wall of the warehouse. To protect the <br /> existing opening, we are replacing the existing roll up door with a minimum 90 minute rated <br /> roll up door with a fusible link to release and close the roll up door if fire is present. <br /> Please reach out to me with and questions in regard to the proposed corrections. I have also included <br /> information on the proposed roll up door to be installed as well as the shop drawing and installation <br /> pack for premanufactured cooler box deferred submittal for your review and approval. <br /> Sincerely, <br /> Matt Schreifels <br /> matts(c�2812architecture.com <br /> 2812 Colby Ave Everett, WA 98201 <br /> 2812 Colby Avenue Everett WA 98201 <br /> P (425)252-2153 www.2812architecture.com <br />