My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 38TH ST 2019-08-22
>
Address Records
>
38TH ST
>
2410
>
2410 38TH ST 2019-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 11:23:04 AM
Creation date
8/13/2019 11:14:34 AM
Metadata
Fields
Template:
Address Document
Street Name
38TH ST
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIAVORKS PERMIT Date Applied: 3/25/2019 <br /> iffjAmm <br /> City of Everett Permit Services Public Works Permit#: PW1903-060 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1901-038 <br /> Everett,WA 98201 Planning Reference#: <br /> j. <br /> (425) 257-8810 Public Works Fee: $85.00 <br /> 2 5 MAR 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CANAM INVESTMENTS LLC SCHREIFELS MATT <br /> 2410 38TH ST <br /> EVERETT, WA, 98201-5300 , , <br /> PHONE: PHONE: 4252522153 <br /> TAX PARCEL ID#: 00576002600004 SITE ADDRESS: 2410 38TH ST <br /> DESCRIPTION: <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 03/25/2019. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to <br /> formally request all required inspections. Flyers are provided at permit issuance with instructions on how to request an <br /> inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection <br /> online by selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for thisprmit when all items <br /> have been completed. � ( <br /> Public Works Permit Fee Breakdown: MAR 2 5 2019 Li <br /> Paving (1493SF) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> .'44512017 expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-wa use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notic- .m the City and to <br /> replace blic property damaged ther-.y. <br /> a3/2-5-/9 <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> ft L Gc i <br />
The URL can be used to link to this page
Your browser does not support the video tag.