My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
125 74TH ST SE 2019-08-13
>
Address Records
>
74TH ST SE
>
125
>
125 74TH ST SE 2019-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 2:08:24 PM
Creation date
8/13/2019 2:08:22 PM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
125
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 11-26-2018(( 15:o <br /> REG-1 0ry:n <br /> t <br /> C1 <br /> RT t <br /> PERMIT r o.181103ir <br /> F, 'ETT P/C �n;�1 <br /> (425)257-8810 CARD $45„01 <br /> Plan Check No.: B1811-036 <br /> Application Date: 11/26/2018 <br /> Tenant: ADULT FAMILY HOME it) <br /> Owner: GHEBRE ALGANESH/TEKESTE HERMONA <br /> Job Address: 125 74TH ST SE <br /> Proposed Use: SFR DETACHED <br /> Description of Work: GRAB BAR INSTALLATION&EXTERIOR <br /> RAMP&HANDRAILS <br /> Plan Check Fee Paid: $45.01 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> / <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.