Laserfiche WebLink
2/25/2019 Page 1 <br /> City of Everett <br /> 2:28:05PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1609-001 Site Address 2328 74TH ST SE <br /> Applied 9/1/2016 Applicant Lot <br /> Approved 10/7/2016 Owner IRVINE RICHARD Block <br /> Issued 10/28/2016 Contractor OWNER Tract <br /> Parent Permit No. Description REMODEL WALLS-KITCHEN-2 BEDROOMS-WASHROOM <br /> Notes <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 4/14/2017 4/14/2017 UFER Ground DWF Approval See notes Footings-as per plans <br /> UFER ground installed <br /> OK for concrete <br /> 4/14/2017 4/14/2017 Footing DWF Approval See notes Footings-as per plans <br /> UFER ground installed <br /> OK for concrete <br /> 4/27/2017 4/27/2017 UFER Ground KMK Approval <br /> 4/27/2017 4/27/2017 Foundation KMK Approval OK to pour <br /> 8/3/2017 8/3/2017 ShearNailing DWF Approval OK for siding. <br /> 6/11/2018 6/11/2018 MECH 04-ROUGH DXW CORRECTION Complete range hood exhaust to outside. <br /> IN Complete dryer exhaust. <br /> Complete 24 hour timer for whole house <br /> exhaust fan. <br /> Insulate exhaust duct in attic. <br /> 6/11/2018 6/11/2018 PLUMB DXW APPROVAL As noted Complete relief line. Will look at on final <br /> 03-ROUGH IN <br /> 6/13/2018 6/13/2018 MECH 04-ROUGH DXW APPROVAL As noted At final-whole house fan to have 24 hour <br /> IN timer,range and range hood installed to <br /> manufacturers specs and have insulation <br /> books on site. <br /> 6/14/2018 6/14/2018 BLDG DWF PARTIAL APPR Install straps or top plate walls off-set 2 <br /> 08-FRAMING locations. <br /> OK to insulate. <br /> 6/26/2018 6/26/2018 BLDG DWF APPROVAL <br /> 08-FRAMING <br /> 6/26/2018 6/26/2018 BLDG DWF APPROVAL OK to cover Provide a copy of insulation certificate at <br /> 11-INSULATION building final and blower door test results. <br /> 7/25/2018 7/25/2018 BLDG DWF CORRECTION Not ready <br /> 09-DRYWALL <br /> 7/27/2018 7/27/2018 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 2/14/2019 2/14/2019 BLDG 15-FINAL DWF NOT READY final E1804-130 (2/11/2019 2:01 PM TKJ) <br /> scheduled inspect Patty Kumbera 425-876-4441.Only <br /> 2/14 available to be on-site until 1:30pm. <br /> Not ready,need electrical,mechanical and <br /> plumbing finals before building final <br /> inspection <br /> 2/15/2019 2/15/2019 MECH 06-FINAL DXW CORRECTION REQUESTING MORNING INSPECTION <br /> 425-876-4441-PATTY KUMBERA <br /> (2/15/2019 10:39 AM DXW) <br /> Anti-tip req.for range. <br /> MFG.spec.to show clearance to <br /> combustable side and back wall or install <br /> stainless steel or ceramic tile to walls <br /> minimum 24 in.above cook top. <br /> INSP12CRWS YS TEM S <br />