�v . ---- :
<br /> �
<br /> z
<br /> o Z
<br /> cn p
<br /> > �
<br /> w Q
<br /> � p
<br /> z ""
<br /> O O
<br /> �
<br /> � 0 .
<br /> � W .=�_,
<br /> � > ,
<br /> W W
<br /> 0 �
<br /> r- ,
<br /> w �
<br /> ¢ �
<br /> �'�., � �
<br /> ````�'�. �/s'APA 2�5 RATED OSB �
<br /> �� SHEATHING W!6d @ 5'O.C. w
<br /> ```��`�� EDGE & 12"O.C. FIELD NAILING � `- �
<br /> �'��,, (U.N.O. IN NOTES) -
<br /> COMP. R-49 INSULATION BAFFLE. �
<br /> INSULATION ```�
<br /> ROOF `��'�. MAINTAIN MINIMUM 1"CLEAR AIR r
<br /> ROOF TRUSS `��` SPACE OVER INSUtATION
<br /> '�
<br /> _ PER FRAMWG `�'�.,
<br /> - PLAN �'�.. � '
<br /> �. .
<br /> °'m t--
<br /> _ ----- R-21 INSULATIQN � w
<br /> � z
<br /> M Ltj
<br /> �
<br /> 5/8" v ?��.
<br /> GWg H1 CLIP AT EACH TRUSS
<br /> - - TO DBL TOP PLATE/HEADER �^
<br /> OR BEAM CONNECTION
<br /> __ ____ RIGID INSULATION
<br /> U � •';
<br /> __ __ BEMIND WEADER(R-10) PER PLAN z �
<br /> � C� Q '
<br /> 2x6 STUDS Q Z � �
<br /> - @ 16"O.C. � � �
<br /> SHEAR WALL � U W � � .
<br /> P E R P L A N �. cn � Z � c� �
<br /> 2x BASE PLATE u) Q � C7 � �
<br /> (NAILWG PER SHEAR U�w � z Q
<br /> WALL SCHEDULE) � r- � �
<br /> LOW SOIL FACE 12-7-17
<br /> V-BAR ""
<br /> Q,
<br /> 3/4'T&G APA24/6 RATED FINISHED GRADE a >I��C
<br /> � PLYWD SHEATHING GLUED NO SURCHARGE�� ° BARSTOP Q a,�S�a�wns���.� ,
<br /> & NAILED TO FLOOR JOISTS ���; �� o,y � a�"�'
<br /> ��,
<br /> ,��, ,� �1 °
<br /> � � � , '�� HIGH SOIL FACE E=-� ; �
<br /> R-21 INSULATION , � 4
<br /> � �WALL - H-BARS V-BARS N WALL PLAN VIEW � ,A�=� �87� ��
<br /> -R�3Q"INSULATION OVER PER TABLE O�, R�T�o �<v ,
<br /> UNHEATE SPACE PER TABLE Q ���SIONAL����
<br /> FLOOR JOIST Z � FREE-DRAINING �
<br /> PER PLAN � GRANULAR MATERIAL -�� V DOWEL BARS
<br /> CEMPLANK z <�� ,�;-.:�;; �-� 12 WIDE MIN. TO WITHW �,fr , a MATCH SPACING W/
<br /> ' 12"OF FINISHED GRADE��,'r, VERTICAL WALL REINF
<br /> SIDING � 6 MIL BLACK VAPOR p , ��.: Q
<br /> � � � �o BARRIER ��o Z �r��z�rr`�.� MIN. 42 BAR 0 LAP �
<br /> � LAP EDGES 12" , � 4"PERFORATED �,, ���
<br /> � �.;� �.. _ �� � .� .
<br /> ���1rr� (,�Ln� °. p `� � SURROUND W/GRAVEL �}�� °
<br /> ^/Vri--jy ��� � ' � �`=t�,� Q SOILOVERTOE `'
<br /> � � � CRAWLSPACE GRADE � �,�;� °� ,,;,,�� � � � _�����
<br /> � � �_� . � ��:, ;� � o ������ V-BARS `� � � .
<br /> �, THIS DIMENSION
<br /> _ � � � � � PER TABLE ° '� w ''�_CAN BE EXTENDED
<br /> O`Y_ . � .��.. ..
<br /> �" - ���� ���` �� AS NEEDED TO REACH
<br /> �— �� �� L-��°��/�S 4��P�RFORATED �� �r,.: a
<br /> � FOOTING DRAW 1
<br /> � � i��� �Lfs� EQ. 8" EQ. SURROUND W/GRAVEL � a a a Q a n 1 SUITABLE BEARING. ,
<br /> BACK ELEVATIC?N � i� � ° a ° aQ
<br /> � � SCALE: 1/4"= 1'-0" ��_4�� ,��,:�y�;;,�;�� �
<br /> ,,.i;
<br /> TYPICAL SECTION T-BA�S - �
<br /> �_ _ PER TABLE C B A M U �
<br /> — SCALE: 3/4"=1'-0"
<br /> —- D
<br /> H A B C D E (MIN.) V-BARS H-BARS T-BARS ,
<br /> 4'-6' 1'-0�� 8�� 2�_��� 3�_8�� ��_��� `#4 @ 12 #4 @ 12 #4 @ 9
<br /> 6'-8' 1'-0" 8" 3'-0" 4'-8" 1'-0" #5 @ 12 #5� 12 #5 @ 12
<br /> 8'-10' 1'-6" 10" 3'-8" 6'-0" 1'-0" #5 @ 9 #5 @ 12 #5 @ 12 �
<br /> 12 CANTILEVERED RETAINING WALL
<br /> �+� SCAI.E: 3/4"= 1'-0" '" -
<br /> �7
<br /> �—�-� SHEAR WALL DO NOT EXCEED 4'-0"SOIL
<br /> 2x BLOCKING OVER
<br /> �� � BEAM BELOW HEIGHT DIFFERENTIAL WHEN .
<br /> I� i WALL FRAMING PER PLAN gACKIFILUNG WALL
<br /> ,� �BEYOND OPENING SHEATHING GLUED&N PLYWD ' t
<br /> P.T. Zx_MUD SILL PLATE W/ /� T&G APA /6 RATED: N ;
<br /> 2x_BLOCKING AILED P.T. 2x MUD SILL PLATE W/
<br /> �� � #4 VER TICAL Y 2'0 A.B. MIN. 7" EMBED W/3"x 3"x%4' O VER BEA M i �� �� �� �� ��
<br /> i; TO FLOOR JOIS TS / 0 A.B. M I N. 7 E M B E D W/3 x 3 X y 4 N �
<br /> ' BAR AT 48"O.C. THICK WASHER AT 48"O.C. &12" (2)#4 TOP BAR THICK WASHER AT 48"O.C. &12" 2x_BASE PLATE �r
<br /> ii I MAX. SPACING FROM END OF EACH MEMBER. �#4 HORIZONTAL FROM END OF EACH MEMBER. (NAIUNG PER SHEAR M \ �j
<br /> II ' (U.N.O. fN SHEAR WALL SCHEDULE} U.N.O. IN SHEAR WALL SCHEDULE WALL SCHEDULE) �/s'APA24/6 RATED OSB �� � .,
<br /> � CONCRETE SLAB& BARS @ 10"O.C. ( ) �
<br /> R RElNFORCING PER CONCRETE SLAB& FLOOR FRAMING SHEATHING W/6d�6"O.C. Z M Q
<br /> EXTERIO �I � RIM JOIST SHEAR FLOW NAILING PER PLANS EDGE & 12"'O.C. FIELD NAILING �
<br /> PAVEMENT �I i FOUNDATION PLAN Z REINFORCING PER � � Z
<br /> � FOUNDATION PLAN OR SIMPSON CLIP AS SPECIFIED (U.N.O. IN NOTES) O � W ,
<br /> �' ' � � � FLOOR JOISTS IN SHEAR WALL SCHEDU�E "
<br /> o b � — — � — � — � ;, ; <;�^' ° � FRAMlNG PLANS. � PER FRAMING 8d @ 6"O.C. � J W � � y
<br /> ,.��. �
<br /> x �4 ,�Y-vr;. ���;-��;� � ° . — —a— PLANS 1)#4 TOP BAR � U W
<br /> ����,� � �` � � INTO BLOCKING
<br /> � � x , �+ �� �
<br /> � � � =,u�o �ooi�v� �- �1 0� � � �` � � U.N.O.�IN SCHEDULE �
<br /> oo�oc�v�lco �u�„ ��s �� t�v p `��_�,��''`"��� �t� �� SIMPSON PC COLUMN � � O
<br /> ROOF TRUSS PER � W
<br /> , �:.a�;?c)a��0���0���J;'1. ,J�11 a _ — ,
<br /> 4'-0" MAX. � �n��,���� ,�' ' �� SIMPSON PB POST BASE OR �
<br /> a q a �;��,��� �`` �i z CAP MATCH TO POS'T �
<br /> UNBALANCED �����,�-� ? � � EQUIV. DRIFT PIN.WIDTH TO & BEAM DIMENSIONS � FRAMING PLAN
<br /> a BACKFILL � � MATCH POST DIMENSIONS , ,,,, , a� ---- � � ��
<br /> a t��o: —
<br /> POST PER PLANS
<br /> x Z ��� a Q
<br /> zac -T � � � �> a • �
<br /> 2 � c y _ ' 4' 4 . / d � . d #4 VERTICAL � z
<br /> _ = c0 0 � ,. ,i�/i��i�;_i",-:; . a �-" �:i/i�/ ',.?i;i � lL� �
<br /> - �p O a i i ,n
<br /> � N ;- � @ TO DBL TOP P ATE/HEADER
<br /> � BARS 12"O.C. #4 HORIZONTAL _ �
<br /> #4 V E R T I C A L a ° a a a z � d BARS @ 10"O.C. � �
<br /> 4 ° BAR AT 12"O.C. � a a . � _ � � � O R B E A M C O N N E C T I O N
<br /> 4"PERFORATED o
<br /> a: � ' � Z a � � FOOTING DRAIN � ° CRAWLSPACE GRADE OVERHANG y '
<br /> ,. � 0 _ � e � � �r .�,,. �� '
<br /> ' a z � a d a . a `" � SURROUND W/ Q ��-���! PER PLAN DBL TOP PLATE � �'
<br /> ° Q ° �\ ao i;;Oc �' a X m ° ° Q a. Q GRAVEL (2)CONT.#4 BARS OR HEADER ELEVATIONS
<br /> � �O, • (2)CONT.#4 BARS W ' 4 AT BOTTOM OF FTG
<br /> � �;�� 4
<br /> 4
<br /> }`.'` " . ,6.. : .
<br /> � � 4"PERFORATED AT BOTTOM OF FTG °. � � °D -•` ' a SHEAR WALL � STUDS
<br /> .:-,��,.�v ..:.
<br /> 4" PERFORATED \\ (2)CONT.#4 BARS FOOTING DRAIN � a a '���'� � PER PLAN 16"O.C.
<br /> AT BOTTOM OF FTG SURROUND WI GRAVEL ° � ° �
<br /> F O O T I N G D R A I N E Q. 8" E Q.
<br /> SURROUND W/GRAVEL EQ. $" EQ. H W H W H W EQ. 8" E Q. ���i� �� ��� R DAT O N: g-28-17
<br /> „ , 0'-4' 16" "W" 0'-4' 16" 2'-0"SONOTUBE 4'-8' 24" � ���+�(��� ��������� DRAWN BY: TJM
<br /> � FOOTING 4'-g' 24° FOOTING
<br /> FOOTING 4'-8' 24" ""
<br /> WIDTH 8'-12' 28" WIDTH $�_12� 28�� 8'-12' 28" WIDTH SCALE: AS NOTED .
<br /> PROJECT NO: W4354
<br /> 1 RIMETER F40TING AT OPENING 2 TYPICAL STEM WALL W/ SLAB � INTERIOR SPREAD Ft)OTING 4 STEM WALL MAX UNBALANCED FILL 5 TRUSS TO SHEAR WALL SHEET No: ���
<br /> P� SCALE: 3/4"= 1'-0" SCALE: 3/4"= 1'-0" SCALE: 3/4"= 1'-0" `
<br /> �+� SCALE: 3/4"= 1'-0" �+� SCALE: 3/4"= 1'-0" �`3 ,S3 S3 fi�
<br /> �7 ti� �J
<br />
|