|
u���i 1 i ' - _ _ _
<br /> GENERAL PROVISIONS C. FABRICATE DUCTWORK FROM GAc�JANI�ED SHEET STFEL COMPLYING p, PROVIDE SPIN-IN FITTINGS WITH DAMPER� AT DUCT D� DETECTO A D MODEHVAC U IT SHALL SHUT DOWN,UANDSMHE E n } ' ,
<br /> WITH ANSI/ASTM, SMACNA, INDU�TRY STANDARDS AND LOCAL TAKE-OFFS TO DIFFUSERS. OUTSIDE AIR DAMPER SHALL CLOSE. A I �1 1 P I U t�O W S �I
<br /> LOW APPLY TO ALL WORK INCLUDED IN CODE REQUIREMENTS. MINIMUM .:�HEET TF�ICKNESS AND J
<br /> A. THE TERMS DEFINED BE REINFORCING SHALL BE AS FOLL�WS: E. FLEXIBLE DUCT ON BRANCH ENDS SHALL BE A MAXIMUM OF �
<br /> THE CONTRACT 70CUMENTS. �
<br /> 5'-0 W LENGTH, WITH A VOLUME DA�IPEF2 MOUNTED AT THE ARC H ITE T
<br /> 1. THE TERM 'WORK' MEANS THE CONSTRUCTION AND SERVICES �• DUCTS UP TO 12" WIDEST DIMENSION (OR DIAMETER): 26 NECK OF THE DIFFUSER. THE VOLUME DAhIPER LEVER SHALL BALANCING AIR AND WATER SYSTEMS
<br /> REQUIRED BY THE CONTRACT DOCUMENTS AND INCLUDES ALL GAUGE HAVE A RED TAG INSTALLED, CLEARLY VISI�LE FROM SIDES OF
<br /> OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES 2• DUCTS 13" TO 30" WIDEST DIMENSION: 24 GAUGE DIFFUSERS ABOVE CEILING. THE FLEXI�LE �UCT SHALL BE A. WHEN THE WORK HAS BEEN COMPLETED NOTIFY THE GENERAL 4� 25 LdIC2IdCld AV2. N., SUlte ZOO
<br /> PROVIDED OR TO BE PROVIDED BY THE CONTRACTOR TO 3. DUCTS 31" TO 54" WIDEST DIMYNSION: 22 GAUGE CONNECTED AT BOTH ENDS WffH STAINLESS SCREW TYPE HOSE CONTRACTOR, WHO SHALL HIRE A BALANCING CONTRACTOR. THE Minneapolis, Minnesota 55422
<br /> FULFILL THE MECHANICAL SUBCONTRACTOR'S OBLIGATIONS. CLAMPS. SYSTEM BALANCING SHALL BE BY AN INDEPENDENT TRADE �F)3-533-�� 7� fax: 763-533-7979
<br /> 2. FURNISH - TO OBTAIN IN NEW CONDI110N READY FOR D. DUCT SEALANT: UNITED DUCT SEALER OR EQUAL. PROVIDE A LICENSED BY THE ASSOCIATED AIR BALANCING COUNCIL (AABC) OR
<br /> INSTALLATION INTO THE WORK. NON-HARDENING, NON-MIGRATING MASTIC OR LIQUID ELASTIC CON�ENSATE PIPING THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) TO r
<br /> 3. INSTALL - TO STORE, SET IN PLACE, CONNECT AND PLACE SEALANT OF A TYPE AS RECOMMENDED BY THE MANUFACTURER :
<br /> INTO OPERATION INTO THE WORK. SPECIFICALLY FOR SEALING JOINTS AND SEAMS IN SHEEf MEfAL A. CONDENSA7E PIPING FROM COOLING COIL .�4ND MOISTURE FROM TEST, ADJUST AND BALANCE ALL SPACF CONDITIONING AND COZ19111t.8I1'tS
<br /> 4. PROVIDE - TO FURNISH AND INSTALL. DUCTWORK. ALL DUCTWORK SHAL.L HAVE SEALED LONGITUQINAL FLUE GASES SHALL BE FURNISHED AND INSTALLED BY THE VENTILATION SYSTEMS. ALL BALANCING WORK SHALL BE
<br /> AND TRANSVERSE JOINTS. WHEf�E SLI� AND DRIVE JOINTS ARE MECHANICAL CONTRACTOR. PROVIDE WATER TRAP AT FACH COIL COMPLETED AND DONE IN ACCORDANCF WITH THE MOST RECENT ,
<br /> 5. CONNECT - TO BRING SERVICE TO THE EQUIPMENT AND MADE, A SEALER SHALL BE APPL.IED OVER THE ENTIRE JOINT AND FLUE DRAIN. RUN BOTH SYSTEMS SEI�ARATELY TO NEAREST STANDARDS OF THEIR SOCIETY. ALL COSTS FOR TESTING AND °
<br /> ��:� �iP�,�L ATT,�CHMcNT INCLUQING NECESSARY SWffCHES, BALANCING SHALL BE INCLUDED IN THE BID. THE MECHANICAL �� �`�
<br /> OUTLETS, BOXES, TERMINATIONS, ETC. AFTER THE DRIVE IS IN PLACE. APPLY A SECONDARY LAYER OF FLOOR DRAIN OR RECEPTOR APPROVED BY` AUTHORITY HAVING ����'.s��-�� ����} �f
<br /> SEALER AT THE CORNERS AFTER THE DRIVE ENDS ARE CRIMPED JURISDICTION. CONTRACTOR SHALL PROVIDE FlNAL AI�C AND WATER BALANCE x -�- �w�
<br /> ��y w�+�"a�.�`z;. ��
<br /> 6. CONDUIT - INCLUDES IN ADDRION TO CONDUR, ALL FITfINGS, IN PLACE. ALL LONGITUDINAL SF�\MS SHA!1 BE COVERED WITH A INSPECTION AND REPORT TO THE LANDLORD, TENANT, ENGINEER, n �
<br /> � ��r�
<br /> PULL BOXES, HANGERS AND OTHER SUPPORTS AND SEALING MASTIC. ALL SLIP JOINTS SHALL BE MADE AND COATED, INSUlATION AND THE GENERAL CONTRACTOR. �������
<br /> ACCESSORIES RELATED TO SUCH CONDUIT. ����s��
<br /> THEN INSERTED INTO THE DUCT OR COLLAR AND SECURED WITH ���
<br /> 7. CONCEALED - HIDDEN FROM SIGHT IN CHASES, FURRED ��
<br /> SPACES, SHAFTS, HUNG CEILINGS, EMBEDDED IN SHEEf MEfAL SCREWS. COVER 'T'HE ENTIRE OUTER JOINT AND A. INSULATION SHALL BE REQUIRED ON �LL SURFACES TO RETARD START UP OF SYSTEMS. GUARANTEE AND INSTRUCTIONS RED WING SHOES
<br /> CONSTRUCTION, IN CRAWL SPACES OR BURIED. SCREWS WITH MASTIC. COVER JOINTS ARf)UND ALL SPIN-IN UNDESIRABLE HEAT TRANSFER AND PREVENT C�NDENSATION.
<br /> 8. EXPOSED - NOT INSTALLED UNDERGROUND NOR CONCEALED FITTINGS. INTERNALLY CLFAN DUCTWORK OF DUST AND DEBRIS. INSULATION SHALL BE APPLIED TO PIPE LIyES, DUCIINORK AND q, GUARANTEE AND MAINTAIN THE STABILITY OF ALL WORK AND PHON'E (800) 733E9464REDFAXN(65M) 38560897
<br /> AS DEFINED ABOVE. EQUIRMENT ONLY AFTER THEY HAVE B�EN TESTED, INSPECTED MATERIALS FOR A PERIOD OF ONE (1) YEAR AF�ER THE F1NAL , -
<br /> E. SUPPORT MATERIALS: EXCEPT AS OTHERVdISE INDICATED, PROVIDE AND ALL SURFACES THOROUGHLY CL�NEL� OF ALL MOISTURE, PAYMENT FOR COMPLETION OF THE WORK AS VERIFIED BY FINAL
<br /> B. THE GENERAL CONDITIONS, SPECIAL CONDITIONS, SUPPLEMENTARY HOT-DIPPED GALVANIZED SHEET ;�ASTENERS, ANCHORS, RODS, FOREIGN MATERIAL, GREASE AND RUST. IN�>ULAl"ION SHALL BE INSPECTION OF TENANT'S ARCHITECT. DEFECTS OF ANY KIND DUE y , 1
<br /> CONDITIONS, AND MECHANICAL SPECIFICATIONS OF THE MAIN MALL STRAPS, TRIM, AND ANGLES F0� SUPPORT OF DUCTWORK. CONTINUOUS THROUGH WALLS, PARTITIONS, SLEEVES, EfC., EXCEPT TO FAULIY WORK OR MATERIALS APPEARING DURING THE '
<br /> SPECIFICATIONS AND "GENERAL CONDITIONS OF THE CONTRACT", WHERE OTHERWISE INDICATED OR SPE�:IFIEO. ALL INSULATION ABOVE-MENTIONED PERIOD MUST BE IMMEDIATELY CORRECTED BY
<br /> CURRENT EDITION, ESTABLISHED IN STANDARD FORM BY THE F. ANY SUPPLY DUCTWORK AND PLtNU�iS THAT ARE DESI�NED TO ADHESIVES, SEALERS AND COATINGS SHALI. HAVE A FIRE HAZARD THIS MECHANICAL CONTRACTOR AT HIS OWN EXPENSE TO THE
<br /> AMERICAN INSTITUTE OF ARCHITECTS SHALL APPLY TO ALL WORK OPERATE AT STATIC PRESSURES GRE�TER THAN 0.25" WG BUT RATING NOT TO EXCEED 25/50/50 FLAME SPREAD, FUEL ENTIRE SATISFACTION OF TENANT'S ARCHITECT AND ENGINEERS. �
<br /> ON THIS PROJECT EXCEPT AS MODIFIED BELOW. COORDINATE THE LESS THAN 2" WG, WHICH ARE f._OCATED OUTSIDE OF THE CONTRIBUTED AND SMOKE DEVELOPED IN ACCORDANCE WITH UL SUCH REPAIRS AND RECONSTRUCTION SHALL INCLUDE ALL DAMAGE , �
<br /> MECHANICAL WORK WITH OTHER TRADES AND TENANT PRIOR TO CONDITIONED SPACE OR IN RETI.�RN PLEPIUMS, SHALL HA�/E 723 AND ASTM-E84. PROVIDE INSULATION FOR HOT AND COLD
<br /> JOINTS SEALED IN ACCORDANCE: WffH SEAL CLASS AS DEFINED IN WATER PIPING, HORIZONTAL WASTE PIPING IN GEILING SPACE, TO THE FINISH OR FURNISHINGS OF THE BUILDING RESULTING '
<br /> INSTALLATION. SUPPLY AIR, REfURN AIR, EXHAUST AI;� AF�ID OUTSIDE AIR SHEET' FROM THE ORIGINAL DEFECT OR REPAIRS THEREfO. OWNERS
<br /> THE SMACNA HVAC DUCT LEAKf�C�E TEST MANUAL. PRESSURE DESIGNATED OPERATING PERSONNEL SNALL BE FULLY INSTRUCTED
<br /> C. THE ARCHITECTURAL, ELECTRICAL AND FIRE PROTECTION PLANS SENSITIVE TAPE SHALL NOT 9E USED AS THE PRIMARY SEALANT METAL DUCTWORK. BY THE MECHANICAL CONTRACTOR IN THE OPERATION OF EACH
<br /> AND SPECIFICATIONS ARE A PART OF THE CONTRACT DOCUMENTS. WHERE SUCH DUCTS ARE DESIGNED 'r0 �)PERA?E AT STATIC MECHANICAL SYSTEM AT THE TIME IT IS PUT INTO SERVICE.
<br /> PRESSURES OVER 1" W.G. B. WHERE NOTED ON THE DRAWINGS, ALL. NEW SUPPLY AND RETURN ASSEMBLE AND DELIVER TO TENANT BEFORE FINAL PAYMENT IS
<br /> THE MECHANICAL CONTRACTOR SHALL VISIT THE SffE AND BECOME DUCTWORK SHALL BE INSULATED WITH EXTERNAL DUCT WRAP.
<br /> FAMILIARIZED WITH ALL CONDITIONS SURROUNDING THE WORK. IF DUCT WRAP SHALL BE FOIL REINFORCk�D K.RAFi' FACING. ALL MADE FOUR (4) 3-RING BINDER COMBINED SETS OF SHOP
<br /> ANY OF THE CONDITIONS REQUIRE A MODIFICATION OF THE DUCTWORK ACCESSORIES INSULATION SHALL MEET NFPA 90A FLAME SPREAD UNDER 25 DRAWINGS, MANUFACTURER'S BULLETINS OR OTHER DATA AS
<br /> SYSTEMS INDICATED BY THESE PLANS AND SPECIFICATIONS, ADVISE AND SMOKE DEVELOPED UNER 50. THiCKNESS, DENSITY AND "R" REQUIRED COVERING THE CARE, MAINTENANCE, AND OPERATION OF
<br /> THE ENGINEER OF THE REQUIRED MODIFICATIONS AND IF A. BALANCING DAMPERS: AIR BALANCE, INC., LOUVERS & DAMPERS,
<br /> APPROVED BY THE ENGINEER, INCLUDE THE COST OF SUCH INC., GREENHECK, RUSKIN, OR EQUAt.. PROVIDE MANUAL, SINGLE VHLUE SHALL BE PER LOCAL ENERGY CODE. INSULATION SHALL EACH PIECE OF EQUIPMENT FURNISHED AND/OR REFURBISHED,
<br /> MODIFICATIONS IN HIS BID. OR MULTIBLADE DAMPERS, AS INDICATED AND AS CONSTRUCTED IN BE FASTENED TO DUCTWORK PER MANUFAt;TURER'S INSTALLATION AND DELIVER TWO (2) BINDERS TO THE GENERAL CONTRACTOR
<br /> ACCORDANCE WITH SMACNA STANDARDS. INSTRUCTIONS AND SMACNA STANDARDS. ROUND BRANCH AND TWO (2) BINDERS TO THE OWNER.
<br /> D. THROUGHOUT THE COURSE OF THE WORK, MINOR CHANGES AND DUCTWORK SHALL BE INSULATED WITH MINIMUM 1" THICK
<br /> ADJUSTMENTS TO THE PLANS AND SPECIFICATIONS MAY BE B. DAMPERS SHALL HAVE RIGID 2" X 1/2" X10-GAUGE CHANNEL FIBERGLASS SLEEVE WITH FOIL JACKEf ANU ALL JOINTS AND PLUMBING .
<br /> REQUESTED BY THE TENANT. MAKE SUCH ADJUSTMENTS WITHOUT FRAMES, BALL OR BRONZE SLEEVE BEARINGS, 1/2" POLISHED TERMINATIONS SEALED WITH FOIL DUCT TAF�E. EXPOSED DUCTWORK .
<br /> IN THE CONDITIONED SPACE DOES NOT NEED TO BE INSULATED.
<br /> ADDITIONAL COST TO THE TENANT, WHERE SUCH ADJUSTMENTS STEEL AXLES, 16-GAUGE, REINFORCED, FELT-EDGED �LADES (NOT A. SUPPORT HORIZONTAL PIPING ADEQUATELY FROM SLABS OR
<br /> ARE NECESSARY FOR THE PROPER INSTALLATION AND OPERATION OVER 8" WIDE) AND STOP FRAMES A�tOUND THE ENTIRE OTHER STRUCTURAL MEMBERS AT INTERVALS SPECIFIED BELOW.
<br /> OF THE SYSTEMS, AND WITHIN THE INTENT OF THE CONTRACT PERIMETER. VOLUME DAMPERS IN DUCTS LARGER 12" X 6" SHALL C. INSULATED FLEXIBLE DUCT SHALL BE GENE:RAL ENVIRONMENTAL USE GRINNELL #260 HANGERS, OR EQUAL, HAVING ADJUSTABLE
<br /> DOCUMENTS. BE THE OPPOSED BLADE TYPE. DAMFERS IN ROUND DUCTS AND CORPORATI�N TYPE G30A, OR EQUAL. FLEXIBLE DUCT RUNS WROUGHT CLEVIS, SOLID RODS AND SOCKETS. PIPING INSTALLED
<br /> SHALL BE LIMITED TO A MAXIMUM LENGTH OF 5'-0". ALONG WALLS SHALL BE SUPPORTED F3Y GRINNELL 199, OR
<br /> E. IT IS THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVlDE DUCTS 12" X 6" AND SMALLER SHAL.L BE BUTfERFLY TYPE. #
<br /> INFORMATION FOR A COMP�ETE INSTALLATION. EVERYfHING ROUND BUTTERFLY TYPE VOLUME; DAMPEFtS SHALL aE 26-GAUGE D. RETURN DUCT IN ATfIC SPACES SHALL B� INSULATED PER THE APPROVED EQUAL, STEEL ANGLE BRACKETS. THE SPACING OF PIPE
<br /> NECESSARY FOR THE COMPLETION AND SUCCESSFUL OPERATION STEEL THROUGH 12" DIAMETER, 24-f�AU(�E FOR ABOVE 12". REQUIREMENTS OF SUPPLY DUCTWORK NO'tED ABOVE. SUPPORTS FOR STEEL PIPE 0" TO 2" SHALL BE 10'-0" FOR
<br /> COPPER PIPE SIZE UP TO 2" SHALL BE 6'-0". HANGERS IN
<br /> OF THE WORK, WHETHER OR NOT HEREIN DEFINITELY SPECIFIED C. PROVIDE VENTFABRICS, YOUNG REGULATOC�, OR EQUAL DAMPERS. CONTACT WITH COPPER SHALL BE COPPER PLATED AND SHALL BE
<br /> OR INDICATED ON THE DRAWINGS, SHALL BE FURNISHED AND E. ROUND BRANCH DUCTWORK SHALL BE INS{JLATCD WITH MINIMUM
<br /> INSTALLED AS WELL AND AS FAITHFULLY AS IF SO SPECIFIED OR ALL DAMPERS SHALL BE EQUIPPED V�ITH STANDARD QUADRANTS 1" THICK FIBERGLASS SLEEV� WITH F�IL J,ACKET AND ALL JOINTS GRINNELL FIG. CT-65 OR APPROVED EQUAL. HANGERS RODS
<br /> INDICATED WITHOUT ADDITIONAL COST TO THE TENANT. THE OF SUITABLE SIZE IN EQUIPMENI" RO��MS/BACK OF HOUSE AREAS. AND TERMINATIONS SEALED WITH FOIL DUC-T TAPE. EXPOSED SHALL BE 1" DIAMEfER FOR PIPES UP TO 2" IN SIZE. PROVIDE
<br /> MECHANICAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND PROVIDE YOUNG REGULATOR MUUEL � 3��1A, OR EQUAL, DUCTWORK IN THE CONDITIONED SPAC�r DC)ES NOT NEED TO BE 18 GAUGE, GALVANIZED STEEL, PIPE SUPPORT SHIELDS, AT ALL ,
<br /> LENGTHS PRIOR TO INSTALLATION. RECESSED-Tl(PE IN FINISHED AREAS. PRUVIDE QUADRANT LOCKING INSULATED. PIPE HANGERS. C@Tt1f1Cat10Il �
<br /> DEVICE FOR EACH DAMPER ON ()NE END OF THE SHAFT AND AN .
<br /> F. NOTWITHSTANDING ANY OTHER PROVISIONS OF THE CONTRACT END BEARING EXTEPvJED QUADF�NT LOCKED AND EXTENDED F. EXCEPTION: IN ACCORDANCE WITH THE EN�RGY CODE INSULATION B. CUT ALL OPENINGS IN FLOORS AND WALLS REQUIRED FOR .
<br /> DOCUMENTS, THE MECHANICAL CONTRACTOR BEARS ULTIMATE BEARING PLATES FOR EXTERNALLY INSULs�TED DUCTWORK. IS NOT REQUIRED WHERE THE DESIGN TEI�PEF�iTURE DIFFERENCE PENEfRATION OF PIPING. COORDINATE OPENINGS WITH GENERAL ,
<br /> RESPONSIBILITY FOR COMPLIANCE OF THE INSTALLATION WITH THE BETWEEN THE INTERIOR AND THE EXTE�:RIOR OF THE DUCT OR CONTRACTOR, WHO SHALL PERFORM Al1 PATCHING AS REQUIRED
<br /> REQUIREMENTS OF THE LANDLORD AND OF THE LOCAL AUTHORITY D. VOLUME DAMPERS SHALL BE PROVIDED IN ALL DUCTS TO PERMIT PLENUM IS NOT GREATER THAN 15° F. BY ARCHITECTURAL SPECIFICATIONS. ALL HORIZONTAL PIPING .
<br /> HAVING JURISDICTION. ACCURATE BALANCING OF THE S`YSTEM. TNE DAMPERS SHALL BE WHICH PENETRATES WALLS SHALL BE FITTED WITH PIPE SLEEVES •
<br /> ADJUSTED TO SATISFY THE HEAT!NG, COC�LING AN� VENTILATING G. IF A �PLIT SYSTEM IS USED SUCTIO�J LI�IES SHALL BE MADE UP OF STANDARD STEEL PIPE 1" GREATER IN DIAMETER � �
<br /> G. IF ANY ERRORS, DISCREPANCIES OR OMISSIONS APPEAR IN THE REQUIREMENTS OF THE CONDITIQNED SPACE AND LOC�CED IN INSULATED WITH 1" THICK FOAM TYPE PIPE WSULATION, AP THAN OUTSIDE DIAMEfER OF PIPE AND PIPE INSULATION. ��, 3• ��N,(3
<br /> DRAWINGS, SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, THE PLACE. ARMAFLEX, OR APPROVED EQUAL WFIEREVER POSSIBLE, �� �Ct
<br /> MECHANICAL CONTRACTOR SHALL NOTIFY THE ENGINEER IN INSULATION SHALL BE SLIPPED OVER �_ENCYTHS OF PIPING BEFORE C. THE VOID BETWEEN PIPE AND SLEEVE SHALL BE SEALED WITH ��Y ��� `���S��f j��'
<br /> WRITING OF SUCH ERROR OR OMISSION. IN THE EVENT THIS E. MOTORIZED DAMPERS: FURNISH AND INSTALL ALL MOTORIZED FINAL FABRICATION WITHOUT SLITTING �fHE INSULATION. ROPE AND FILLED WITH EXPANDABLE (NON-SHRINKING) CEMENT. ��� '. �� ,�
<br /> CONTRACTOR FA'LS TO GIVE SUCH NOTICE BEFORE CONSTRUCTION DAMPERS SHOWN ON THE PLA�I� AND R�QUIRED FOR SYSTEM
<br /> AND/OR FABRICATION OF THE WORK, HE WILL BE HELD OPERATION AND AS DESCRIBED IN THIS SECTION AND NOT BEING SLEEVES SHALL BE OF SUCH LENGTH THAT THEY END FLUSH cr� _-- �.�, �{ ' s
<br /> RESPONSIBLE FOR THE RESULTS OF ANY SUCH ERRORS, FURNISHED WITH EQUIPMENT. DA�IPEF;S �HALL BE OPPOSED WITH WALL FINISH ON BOTH SIDES OF WALL. WHERE UNCOVERED '�"'
<br /> FIRE/SMOKE DAMPERS EXPOSED PIPES PASS THROUGH WALLS THEY SHALL BE FITTED �
<br /> DISCREPANCIES OR OMISSIONS AND THE COST OF RECTIFYING BIADE WITH NEOPRENE EDGES AND SHALL NOT BE LESS THAN 13 WITH CRANE 10, OR EQUAL, WALL PLATES. �
<br /> SAME. GAUGE GALVANIZED STEEL, FORMED FOR EXTRA STRENGTH WITH A. GALVANIZED STEEL CURTAIN TYPE WITH INIERLOCKING BLADES, # � ����'
<br /> MOUNTING HOLES FOR ENCLOS�D DUCT MOUNTING. STAINLESS STEEL GLOSURE SPRINGS AND LATCHES FOR '
<br /> H. COMPLY WITH THE REQUIREMENTS OF ALL STATE AND LOCAL HORIZONTAL INSTALLATION, BLADES OUT OF AIR STREAM, FUSIBLE D. ALL PENETRATIONS THROUGH FIRE RATED MATERIALS SHALL BE ��'�r,��'C�STL:R�'�
<br /> CODES REGULATING THIS WORK. GRILLES. REGISTERS AND DIFFUSERS LINKS, UL LISTED 33. SEALED AS NEEDED AND REQUIRED TO COMPLY WITH THE �',�r��N��J�;�L
<br /> APPROPRIATE U.L. REQUIREMENTS.
<br /> I. PAY ALL FEES AND RELATED CHARGES FOR PERMITS, LICENSES, A. FURNISH AND INSTALL TITUS, KRUEGER, PRICE, ANEMOSTAT OR
<br /> ETC., REQUIRED FOR INSTALLATION OF THE MECHANICAL SYSTEM. EQUAL, AS SCHEDULED. OPPOSED BLADE VOLUME DAMPERS FOR B. ACCEPTABLE MANUFACTURERS: GREENHECK, LOUVERS & DAMPERS, E. ALL ABOVE GROUND WATER SUPPLY PfPE SHALL BE TYPE L HARD
<br /> REGISTERS SHALL BE TITUS SERIES AG-35, KRUEGER SERIES RUSKIN OR EQUAL. TEMPER COPPER WATER TUBE COMPLYING WITH ASTM B88 AND
<br /> OBC, OR EQUAL FOR OPPOSEU BLAUE TYPES WITH VERTICAL
<br /> J. REIMBURSE THE ELECTRICAL CONTRACTOR, WITHOUT ANY COST TO ANSI/NSF STANDARD 61. ALL FITTINGS SHALL BE WROUGHT
<br /> � � BLADES AND SCREWDRIVER SLOTS OR ALLEN WRENCH EgUiPMENT - SCOPE
<br /> �._�a�r nR I�.�lJi QR�; ANY AD�lTIONAL EXPENSES THE COPPER COMPLYING WITH USASI 616..18 & B16.18a. DIELECTRIC
<br /> ADJUSTMENT ACCESSIBLE THROIJGH THE REGISTER. IT SHALL BE
<br /> ELECTRICAL CONTRACTOR INCURS DUE TO THE MECHANICAL COUPLINGS SHALL BE USED BEIWEEN STEEL AND COPPER
<br /> THIS CONTRACTOR'S RESPONSIBiI_ITY �TO I'ROVIDE MISCELLANEOUS
<br /> CONTRACTOR'S SUBSTITUTION OF MECHANICAL EQUIPMENT HAVING A. UNLESS OTHERWISE NOTED, FURNISH e�LL �BOR, MATERIALS AND CONNECTIONS. ALL BELOW GROUND WATER SUPPLY PIPE SHALL
<br /> ITEMS AS NECESSARY FOR A COMPLE.TE AND PROPER
<br /> DIFFERENT ELECTRICAL SERVICE REQUIREMENTS THAN THE EQUIPMENT FOR THE INSTALLATION OF A COMPLEfE AND TENANT BE TfPE K SOFT TEMPER COPPER WATER TUBE. USE LEAD FREE PTO @Ct Information
<br /> SCHEDULED EQUIPMENT. INSTALLATION IN THE TYPES OF WALL.S, ��ND CEILINGS USED ON ACCEPTABLE OPERATING HEATING AND AIR CONDITIONING SYSTEM SOLDER ON ALL JOINTS IN POTABLE WATER PIPING. � . r
<br /> THIS PROJECT. THIS SHALL INGLUDE SUGH ITEMS AS FASTENERS, HEREIN DESCRIBED, AND AS SHOWN GN PLANS. THE SPACE IN �
<br /> PLASTER RINGS AND SUPPORTS, EfC. GENERAL SHALL BE HEATED AND C00'ED BY ��EANS OF AN RE D WIN G �H 0 E S
<br /> K. PROVIDE THE ARCHITECT AND/OR OWNER WITH A MINIMUM OF ' F. IF PERMITTED BY LOCAL CODES AND THE LOCAL AUTHORITY
<br /> FIVE CERTIFIED COPIES OF ALL SHOP AND EQUIPMENT DRAWINGS EXISTING PACKAGED ROOFTOP AIR CONDITI��NING UNIT. HAVING JURISDICTION, THE CONTRACTOR MAY PROVIDE ABS OR
<br /> B. DUCT PLASTER RINGS AT ALL WALL F'ENf_TRATIONS SHALL BE •
<br /> FOR HIS APPROVAL, TWO OF WHICH SHALL BE REi'AINED BY THE BVC PIPING IN LIEU OF CAST IRON FOR SANITARY WASTE AND RE M 0 D E LIN G F 0 R
<br /> ARCHITECT, AND THE REMAINING BEING RETURNED TO THE PRICE INDUSTRIES #DRF, DPR 0;� PR IN AN APPROPRIATE SIZE B. ROOFTOP AIR CONDITIONING UNIT: VENT PIPING OR IN LIEU OF COPPER PIPING FOR DOMESTIC �
<br /> G E N E R A L C O N T R A C T O R. D R A W I N G S S H A L L B E S U B M I T f E D BEFORE TO MATCH DUCT. FINISH TO MA7CH WALL OR DUCT.
<br /> START OF CONSTRUCTION. FAILURE OF COMPLIANCE WITH THIS P R O V I D E C A R R I E R, T R A N E, Y O R K O R E Q U A I_ R O O F f O P A I R WATER PIPING. CONTRACTOR SHALL VERIFY WITH OTHER TRADES
<br /> PARAGRAPH WILL RESULT IN WITHHOLDING OF FINAL PAYMENT. CONNECTIONS CONDITIONING UNIT AS SCHEDULED OP.3 TH�= DRAWINGS. UNIT PRIOR TO SUBSTITUTION THAT THERE IS NO PLENUM REfURN ON NE� COMPANY STORE
<br /> SHALL BE DIRECT OR BELT DRIVE (IF BEL7-DRIVE PROVIDE THIS PROJECT.
<br /> L. PROVIDE A WRITTEN WARRANTY THAT THE EMIRE INSTALLATION IS A. ALL SQUARE ELBOWS SHALL HAl'E TI`fUS, KRUEGER OR BELT-DRIVE FAN) UNIT SHALL BE COI�IPLETE WffH, ADJUSTABLE
<br /> FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A STREAMLINED TURNING VANES. DRIVE, INTERNALLY INSULATED HOUSIN=�, D�RECl' EXPANSION G. ALL ABOVE GROUND SANITARY WASTE AND VENT PIPING SHALL BE
<br /> PERIOD OF ONE YEAR, EXCEPT THAT AIR CONDITIONING COOLING COIL, GAS HEAT, COMPRESSC3R, �,IR COOLED CONDENSER, NO-HUB CAST IRON SANITARY SYSTEM COMPLYING WITH CISPI
<br /> COMPRESSORS SHALL BE WARRANTED FOR FIVE (5) YEARS AND B. ALL BRANCH TAKEOFF DUCTS SF�ALL BE OF THE PROPORTIONAL DRIP PAN, FILTER SECTION WITH THRCaWAWAY F;LTERS, INTEGRAL #301-69T. ALL BELOW GROUND SANITARY AND WASTE PIPWG
<br /> GAS FiRED HEAT EXCHANGERS SHALL BE WARRANTED FOR TEN TYPE UNLESS SPECIFICALLY SHG'NN �)THE:RWISE. VOLUME DAMPERS VIBRATION ISOLATORS, DRY -BULB ECONOMIZEFt, AND 14°�HIGH SHALL BE NO-HUB CAST IRON SANITARY SYSTEM COMPLYING WITH Red lfing Shoe Store �
<br /> (10) YEARS. ARE REQUIRED ON ALL TAKE-UFFS. ROOF CURB. PROVIDE WITH ADDITIONA�_ ACCESSORIES AS CISPI #301-69T OR SERVICE WEIGHT CAST IRON HUB AND 221 SE Everett Mall 1Pay, #M-2
<br /> SCHEDULED ON THE DRAWINGS. SPIGOT WITH NEOPRENE GASKEf COMP�YING WITH CISPI Everett, 1PA 98208
<br /> M. ALL WORKMANSHIP AND MATERIALS SHALL MEEf OR EXCEED THE C. ALL OPENINGS IN DUCT FOR GRILLES, �EGISTERS, EfC, SHALL BE #HSN-68T OR SCHEDULE 40 PVC BELOW GRADE OR AS '
<br /> INDUSTRY FOR QUALITY IN EVERY RESPECT. ALL MATERIALS AND CAPPED DUST TIGHT WITH G.I. METAL CAPS DURING THE C. VERIFY OPERATING VOLTAGE WITH ELEC;TRICAL CONTRACTOR PRIOR REQUIRED FOR LANDLORD APPROVAL AND LOCAL CODE.
<br /> EQUIPMENT SHALL BE NEW, OF THE LATEST DESIGN AND FREE OF CONSTRUCTION PERIOD. TO ORDERING.
<br /> DEFECTS. D. ROUND BRANCH DUCT CONNEC�fI�JNS TO RECTANGULAR MAINS H. FURNISH AND INSTALL VALVES WHERE INDICATED ON PLAN AND Revi9ions
<br /> SHALL BE MADE WITH SPIN-IN--(�ONICAL TAKEOFF V',ITH IIJTEGRAL NECESSARY FOR PROPER SYSTEM OPEr'�ATION AND COMPONENT
<br /> N. DESIGN ALL PIPING AND DUCTWORK TO PRESENT A NEAT AND SPAt'� TEMPERATURE CONTROL REQUIREMENTS ISOLATION. PROVIDE VALVES RATED FOR 125 PSI OR GREATER
<br /> ORDERLY APPEARANCE. RUN ALL LINES PARALLEL WITH BUILDING VOLUME DAMPER AND QUADRAMT OPI:RATOR AND EXTRACTOR AIR WORKING PRESSURE IN WATER PIPING.
<br /> WALLS AND CONSTRUCTION. KEEP PIPING AND DUCTWORK FREE SCOOP.
<br /> FROM CONTACT WITH STRUCTURE OR EQUIPMENT TO PREVENT A. PROVIDE, UNLESS NOTED OTHERWISE> ALL ELECTRIC WIRING,
<br /> NOISE TRANSMISSION. ALLOWING CLEARANCE FOR EXPANSION AND E• WHERE DUCTS RUN THROUGH BAR JOISTS OR OTHER CEILING THERMOSTATS, SENSORS, CONTROLLERS, REIAYS, CONTACTORS, CHECK VALVE UP TO 3": CRANE N0. 37, OR EQUAL
<br /> CONTRACTION. PROVIDE ACCESS DOORS OR PANELS FOR ALL SPACES AND STRUCTURAL, MECHANIC,4L �R ELECTRICAL DAMPERS, ACTUATORS AND ALL OTHER MAfERIALS NECESSARY FOR GLOBE VALVE UP TO 3": CRANE N0. 1240, 1241, OR EQUAL
<br /> VALVES, CLEANOUTS, DAMFERS, CONTROLS, DEVICES, EfC. INTERFERENCE IS ENCOUNTEREf�, SHE=ET MEfAL WORKER SHALL A COMPLETE AND PROPERLY INSTALLED 0!'ERATING TEMPERATURE GATE VALVE UP TO 3": CRANE 428, 1334, OR EQUAL _
<br /> MODIFY DUCTWORK TO MAIIvTAIN SAME= CROSS-SECTIONAL ARFA AS CONTROL SYSTEM THAT IS COMPATIBLE WIl"H THE INSTALLED
<br /> INDICATED ON THE PLANS WITH A MFXIMUM OF 5 TO 1 ASPECT EQUIPMENT AND ALL LANDLORD REQUIREMI:NTS, INCLUDING BALL VALVE UP TO 3": APOLLO SERIES 70-100, OR EQUAL
<br /> 0. PROVIDE VIBRATION ISOLATION DEVICES FOR ALL MOVING RATIO. EMERGENCY SHUTDOWN OF HVAC EQUIPMEM, UNLESS OTHERWISE PRESS. RELIEF VALVE: WATTS 10L MOD. M4, OR EQUAL, '/"M X
<br /> MACHINERY. PROVIDE FLEXIBLE CONNECTIONS TO ALL MOVING NOTED. '/<"F
<br /> MACHINERY. FLEXIBLE CONNECTIONS SHOCKSTOP: WADE #10 (HOT), WADE #5 (COLD) �� '
<br /> P. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH THE A. PROVIDE VENTFABRICS INC., DUFtO DYNE OR EQUAL. PROVIDE B• PROVIDE NEW ELECTRONIC 7-DAY PROGRAMMABLE THERMOSTAT BACKFLOW PREVENTER: WATTS NO. 009, OR EQUAL Date: O$`02�18
<br /> NATIONAL CERTIFIED PIPE WELDING BUREAU, LOCAL CODES OR FLEXIBLE DUCT CONNECTIONS WHERE'JER DUCTWORK CONNECTS OF COMPATIBLE MANUFACTURER AS TFIE HVAC UNIT AT LOCATIONS VACUUM RELIEF VALVE: WATfS N0. 36A - '/4", OR EQUAL
<br /> OTHER APPROVED PROCEDURE CONFORMING TO THE ASME CODE TO VIBRATION ISOLATED EQUIPA�IE.NT fiND WHERE SHOWN dR SHOWN ON PLAN. VERIFY THAT ALL TE:MPERATURE CONTROL DraWII By: MMS
<br /> FOR PRESSURE PIPING. NOTED. MAKE AIRTIGHT JOINTS. PROV�DE ADEQUATE JOINTS. SEQUENCES ARE OPERATING PROPERL'l AI�D TO THE INSTALLATION
<br /> REQUIREMENTS OF THE NVAC UNIT MANUF��CTURER. UNLESS I. INSULATION SHALL BE REQUIRED ON ALL SURFACES TO RETARD Checked Bp• JJL
<br /> Q. FURNISH ALL MATERIALS AND LABOR FOR COMPLEfE AND FULL NOTED OTHERWISE, OR AS �IRECTED E3Y T`=NANT, PROGRAM TO UNDESIRABLE HEAT TRANSFER AND PREVENT CONDENSATION. '
<br /> OPERATION OF THE ENCOMPASSED SYSTEMS. ACCESS PANELS THE FOLLOWING SETPOINTS: INSULATION SHALL BE APPLIED TO PIPE LINES, AND EQUIPMENT Job Number• 18RW-E18
<br /> ONLY AFTER THAT HAVE BEEN TESTED, INSPECTED AND ALL '
<br /> A. PROVIDE ACCESS PANELS AT A11� REHEAI" COILS, FlRE DAMPERS, OCCUPIED HEAT - 70'F SURFACES THOROUGHLY CLEANED OF ALL MOISTURE, FOREIGN '
<br /> R. BEFORE BIDS ARE RECEIVED, INFORM THE OWNER OF PERCEIVED MOTORIZED VOLUME DAMPERS, CONTF?OL EQUIPMENT, ELBOWS ON MATERIAL, GREASE AND RUST. INSULATION SHALL BE CONTINUOUS ;
<br /> OMISSIONS, ISSUES IN THE SPECIFICATIONS OR ISSUES ON THE DUCT MAINS WITH TURNING VANES 0�� 07FIER EQUIPMENT OCCUPIED COOL - 75'F THROUGH WALLS, FLOORS, PARTITIONS, SLEEVES, EfC., EXCEPT
<br /> PLANS. OTHERWISE, THE ABOVE DOCUMENTS WILL BE CONSIDERED REQUIRING MAINTENANCE TO PERMIT EAS`� ACCESS FOR HEATING NIGHT SEfBACK - 60'F
<br /> SUFFICIENT NOTIFICATION TO PROVIDE MATERIAL AND LABOR FOR WHERE OTHERWISE INDICATED OR SPECIFIED. ALL INSULATION
<br /> A COMPLETE AND OPERATIONAL SYSTEM. INSPECTIONS AND MAINTENANCE. PAN=LS SHALL BE LOCATED ON COOLING NIGHT SET BACK - 85'F 25/50/50 FLAME SPREAD, FUEL CONTRIBUTED AND SMOKE
<br /> BOTfOM OR SIDES OF DUCT SUCH TI�AT MAINTENANCE CAN BE DEVELOPED IN ACCORDANCE WITH UL 723 AND ASTM-E84.
<br /> DUCTWORK PERFORMED. PANELS SHALL BE SEf IN f�IGID FRAME WITH SE,�G`JENCE OF OPERATION PROVIDE INSULATION FOR HOT AND COLD WATER PIPING,
<br /> CLOSED-CELL SOF�f' GASKEf, DOJBLE W/�LL INSULATED AND HORIZONTAL WASTE PIPING IN CEILING SPACE. PROVIDE PIPE .
<br /> A. THE AIR DISTRIBUTION SYSTEM SHALL BE FABRICATED AS COMPLETE WITH TWO LATCHES F�R C�00�2S UP TO 18"X18" AND A. OCCUPIED HOURS: SUPPLY FAN SHALL. OPERAT= CONTINUOUSLY, INSULATION BY MANVILLE, OWENS CORNING, OR EQUAL. �
<br /> RECOMMENDED IN THE LATEST EDITION OF THE SMACNA LOW FOUR LATCHES FOR LARGER D��JRS. AND THE OUTSIDE AIR DAMPER SHALL OP[:N TO THE MINIMUM
<br /> VELOCITY DUCTWORK MANUAL AND INSTALLED WHERE SHOWN ON INSTALLATION POSffION. COOLING OR HEATING SHALt.. CY•�LE f0 MAINTAIN SPACE J. PIPE INSULATION SHALL BE '/ INCH TFIICK FIBERGIASS WITH ALL �
<br /> HVAC PLAN. FURNISH ALL REQUIRED DAMPERS, TRANSITIONS, AND TEMPERATURE SEfP01NT. SERVICE JACKET, OR AS REQUIRED IN ACCORDANCE WITH LOCAL �
<br /> CONNECTIONS TO AIR TERMINALS NECESSARY FOR A COMPLETE A. PROVIDE DUCTWORK IN CONFOf;�IANC� TU LAT�ST ADDITION OF ENERGY CODES.
<br /> Sheet Information
<br /> OPERATING SYSTEM. SMACNA STANDARDS. B. UNOCCUPIED HOURS: OUTSIDE AIR DA��PEk SHALL BE CLOSED.
<br /> B. FABRICATE AND INSTALL AS RECOMMENDED IN LATEST SUPPLY FAN AND CONDENSING UNIT/SECTiON OR GAS HEATING K. ORDER ALL EQUIPMENT REQUIRED WITFiIN TEN DAYS UPON MECHANICAL �
<br /> EDITION OF SMACNA HVAC DUCTWORK CONSTRUCTION STANDARDS B• ALL DUCTWORK SHALL BE RUN SUBSTANTIALLY AS SHOWN SHALL CYCLE TO MAINTAIN SPACE TEMPERaTURE SETPOINT. RECEIPT OF CONTRACT IN ORDER TO ENSURE TIMELY RECEIPT OF
<br /> - MET'AL AND FLEXIBLE AND THE ASHRAE GUIDE AND DATA BOOK ON THE DRAWINGS WITH BENDS AND CUf2VES IN COMPLIANCE MATFRIAL. SUBSTITUTIONS AFfER THIS DATE DUE TO LACK OF SPECIFICATI�NS
<br /> FOR SHEET MET'AL DUCTWORK SERVING SUPPLY, RETURN AND WITH L4TEST EDITION OF SMACNA STANDARDS. IN NO CASE SHALL C. ECONOMIZER E�AODE: DRY-BULB CONTROLLED ECONOMIZER SHALL PLACEMENT OF ORDER, WILL NOT BE APPROVED.
<br /> EXHAUST SYSTEMS OPERATING BETWEEN -2.0 IN. W.G. AND +2.0 THE INSIDE RADIUS BE LESS THAN THE WIDTH OF THE DUCT ACTIVATE WHENEVER THE OUTSIDE AIR DRY-BULB IS LOWER THAN
<br /> IN. W.G. MAXIMUM PRESSURE. INSTALL WHERE SHOWN ON THE EXCEPT WHERE DUCT TURNING VANE� ARE USED. CHANGES IN THE DRY-BULB CONTROL SETTING. ECONO:NIZER DAMPERS SHALL L. CLEAN, DISINFECT AND TEST ALL PLUMBING AND PIPING SYSTEMS
<br /> PLANS. DUCT SIZES SHOWN ON THE PLANS ARE INTERIOR CLEAR SIZE OR CROSS SEC710N SHALL BE �IADE WITH LONG TAPERS. MODULATE TO FULL OPEN POSITION, AS R�QUIRED, TO MAINTAIN AS REQUIRED BY LOCAL CODES AND IANDLORD'S CRITERIA.
<br /> DIMENSIONS. WHERE INTERNAL INSULATION IS PROVIDED, DUCT THE ENGWEER RESERVES THE RIGHT TO SLIGHTLY CHANGE THE DISCHARGE AIR TEMPERATURE BETWEEN 52 AND 58 DEGREES � t
<br /> SIZES SHALL BE INCREASED AS REQUIRED TO MAINTAIN THE RUN OF CERTAIN DUCTS WITHO�IT EX"�RA COST TO TNE OWNER IF FAHRENHEIT. MECHANICA! COULING/HEATIN�� SHALL BE LOCKED M. PROVIDE PLUMBING FIXTURES AS SCHEDULED ON PLANS.
<br /> INDICATED INTERIOR CLEAR DIMENSIONS. PROVIDE DUCTWORK IN NECESSARY TO AVOID UNFORESE�N ��TRUCTUF2AL OR OTHER OUT OF ECONOMIZER PAODE. N';-!EN THE S�'ACE TEMPERATURE COPYRIGHT 2018, ALAN J. PLUTOWSKI
<br /> ,"�C�QRD;�!`d�'F !h`fTH !�"DUS?F;Y ST,��N�JARDS FOR ACHIEVING AIR INTERFERENCES. SEfP01NT IS SATISFIED, THE DAMPER SHALL RETURN TO THE
<br /> TIGHT 5 PERCENT LEAKAGE AND NOISE�ESS (NO OBJECTIONABLE C. BEFORE FABRICATING ANY !�UCTWORK, TAKE ACCURATE MiNIMUM OUTSIDE AIR POSITION DURING O��CUPIED MODE, AND
<br /> NOISE) SYSTEMS, CAPABLE OF PERFORMING EACH INDICATED MEASUREMENTS ON THE JOBSITE TO INSURE PROPER CLOSE COMPLEiELY DURING UNOCCUPIED MODE.
<br /> •
<br /> SERVICE. CLEARANCES.
<br />
|