Laserfiche WebLink
T PUBLIC WORKS PERMIT Date Applied: 5/3/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1805-010 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $90.00 <br /> • OW • ' ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PUBLIC UTILITY DIST 1 S 0 CO PUBLIC UTILITY DIST 1 SNO CO <br /> '-t CALIFORNIA 2320 CALIFORNIA <br /> EVERE , TT •, -: el EVERETT, WA, 98201 <br /> PHONE: 4252312145 PHONE: 4252312145 <br /> TAX PARCEL ID#: 00392200000300 SITE ADDRESS: 1802 75TH ST SW <br /> DESCRIPTION: TEMPORARY STOCKPILING OF GRAVEL AND NATIVE MATERIAL IN PUD YARD <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 5/3/2018. Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to <br /> request a Final for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $50.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00n <br /> MAY - 32016 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> // <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> (-4-AAA- <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> / 6131z018.Qexpenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 57.S /5( <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />