My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
818 94TH ST SE 2019-08-14
>
Address Records
>
94TH ST SE
>
818
>
818 94TH ST SE 2019-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2019 8:55:35 AM
Creation date
8/14/2019 8:55:31 AM
Metadata
Fields
Template:
Address Document
Street Name
94TH ST SE
Street Number
818
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KG �- 1 lcw• t°Vn <br /> Lrtt J LU. (TUE) 1I <br /> T° ° REG-1 020427 <br /> r.T 1 <br /> P RMiI rif l ,.W6 <br /> Nr. <br /> • <br /> IL $319.96 <br /> (425)257-8810CHR'r $319.96 <br /> Plan Check No.: B1809-036 <br /> Application Date: 9/25/2018 <br /> Tenant: [TenName] <br /> Owner: BELAY ASFAW <br /> Job Address: 818 94TH ST SE <br /> Proposed Use: SFR DETACHED <br /> Description of Work: INTERIOR RENOVATION/DEMO AND <br /> CONSTRUCT WALLS-ADULT FAMILY <br /> Plan Check Fee Paid: $319.96 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> 121)1---c-= .5:,:4 ( p-1- 25/ X18 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.