My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
729 100TH ST SE Geotech Report 2018-01-02 MF Import
>
Address Records
>
100TH ST SE
>
729
>
Geotech Report
>
729 100TH ST SE Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:36:45 AM
Creation date
8/15/2019 9:48:22 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
729
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� IID l. NELSON AND ASSOCIATES, INC. l <br /> ConsulNng Enginrrring Geology <br /> April 7, 1989 <br /> Pro�ect No. 3989 <br /> Dage 4 <br /> downslope along the east side of the property, and continuing at a minimum <br /> 1/2S grade to the nortF.western portion of the s1te. After excavation of the <br /> trench, a perforeted 6 inch PVC pipe should be placed along the bottom of the <br /> trench, and covered with 6 inches of pea gravel . Cleanout rlsers sAouid be � <br /> pler.ed at accessible ereas, preferabiy at the up-gradient end, and at the <br /> northMest and northeast bu11d1ng torner ereas. Backfill within the trench <br /> ebove the pee gravel should conslst of 2 lnch crushed rock (railroad <br /> ballast), compected into plece to Nithin 12 inches of the surface grade. A <br /> geotextlle should then be placed ebove the crushed rock, and structural fill <br /> placed above the geotextTle up to finish grade. <br /> Proofro111ng <br /> After dewetering drain placement, the proposed development area should be <br /> proofrolled using a vibratory drum roller with static drum weight uf at least <br /> 10,000 pounds, and a dynamic rating of at least 25,000 pounds. The compactor <br /> should be run over the erea at a slav rate for about 4 hours, end observed by <br /> this office during proofrolling. The performance of the proofrolling <br /> technlque should aid in observin9 any soft spots which may occur wlthin the <br /> exlsting fill body, and provlde some additional compaction of the existing <br /> fill meterials. Any soft spots noted should be remaved and replaced with <br /> structural f111 . <br /> Structural Fill <br /> Generol : <br /> All f111 pia�ed beneath Dulldings, pavements, or other settlement sensitive <br />� features should be placed es structural f111. Structural fi11 , by definitlon, <br /> is placed in accordance with prescribed methods and stanAards, end is <br />� monitored by en experienced geotech M cal professtonal or soils technicien. <br /> Field monitoring procedures would include the performance of t representative <br />� number of 1n-place density tests to document the attalnment of the deslred <br /> degree of relative cumpact9en. <br /> r <br />� <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.