Laserfiche WebLink
� � � � <br /> Plan Check No. B 57215 � <br /> December 8, 1997 I <br /> Page of 2 � �, <br /> �fN��,e l nb�rA►�- . <br /> I l� <br /> f�y���oEo• k�� �� <br /> �(�� 7. ✓Compression struts should be shown on Detail 4lf1.01 per UBC Stnndard 25-2, Section <br /> � 25.2123. , <br /> P.�rrier- ree Deaign I <br /> ,NO'�� � �2.A'S � SZ.A(, <br /> � p�oof-��1_H�ne�oor hardware shall be lever-type operating herdware per Section 1 ]06.3.1. <br /> �fNElY 2. ✓It should be verified thet door 309 hes 18" clearence on the latch side for the fonvard <br /> /�a..ob��, q approach. The actual dimension should be shown on the plans. Section 1106.10.3 item 1 <br /> poil� Az.e� � <br /> SF� M�°9�3� �The length, height, diameter, wall clearance, and position of the two grab bars at the water <br /> �•e closet in room 302 should be dimensioned on the plans. Section 1106.11.53 <br /> 5�� R�'A�,�-ro <br /> �.,e3 4. ✓1he length, height,diameter, wall clearance, and position of the three required grab bers et the <br /> I A mll-in shower should be shown on the plans. Section 1106.11.10.4 <br /> - -f. <br /> SEE��,��/N 5. �A shower spray unit, with a hose et least 60 inches in Iqngth, thet can be used es a fixed <br /> p¢fe��- '1�'� shower head or as a hand-held shower, should be shown on Detail 4/A4.03. Section <br /> 1106.11.10.5 <br /> EE����'`�o <br /> �j ✓f'he height of the show�er faucet should be shown dimensioned on Dctail 5/A4.03. Section <br /> pCfa�' y�/�4D�1106.11.10.5 <br /> Prepare a response letter showing where each item in this conection letter is addressed on the plan <br /> set. <br /> Upon resubmittel of the drawings, your application will be given prioriry and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that the i <br /> proposed stntcture will be conswcted in compliance with alt adopted codes. <br /> Sincerely, <br /> ��,��� <br /> T ny L.ee <br /> Associate Engineer <br /> n�.�mx�envk�fi <br />