Laserfiche WebLink
FOR OFFICE USE ONLY PERMIT# e x'11 "t0-1 <br /> BUILDING PLANNING, <br /> Bldg/TI/Addn/Rem Size Zoning Classification R-3 <br /> Garage Size -7 4-tti Sie, Overlay/Agreement <br /> VALUATION 2 2-1720 Nonresidential Use <br /> Number of Stories I Residential Use HQtn c)F-,sj 1 ov <br /> Occupancy Group tit Proposed No. of Dwelling Units: 9 <br /> Occupant Load Total No.of Dwelling Units: 1 <br /> Basement No. Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction - J6--i7 needed before final? Yes No <br /> Existing Sprinkler System? Yes_ No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved by: 1 L, Date: S /1- I-l7 <br /> Existing Fire Alarm Yes_ No—Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes_ No <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes No Calculated School Impact Fee: <br /> Architectural Approved By/Date: ' I i113`/'&- School Impact Fee Credit: <br /> Structural Approved By/Date: Total School Impact Fee Owed: <br /> Comments: 2 0/6- /2G Comments: 1 n reel ltoMe_/colooA— <br /> Intake OK by: Intake OK-by: Ok to route _ Hold <br /> Make this a"W"Permit? Yes No <br /> PU LIC WORKS. <br /> FEES INTAKE: Checked By: <br /> (.1)1.3 <br /> �'�+' Date: <br /> Plan Check Fee Comments: A 14 Schee--Building Permit ��} <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrerr Review(separate gree f der) <br /> Ping Bldg Review Fee PW REVIEW: PW ReviewerjE- Date: le <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee IRE PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIREDEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes— No_ Existing Bldg._ <br /> Update/New Detection Yes No_ Existing Bldg. <br /> Update/New Chemical Yes_ No_ Existing Bldg._ <br /> Update/New Fire Service Yes_ No_ Existing Bldg._ <br /> Approved by: Date: <br /> Comments: E, 17\;,,r <br />