I <br /> • • • I • <br /> a' <br /> Design footings to comply with the following additional requirements: <br /> • To keep footings directly under I-beams and other support points, size them <br /> slightly larger than the minimum required area to allow slight adjustment of the <br /> pier location during home installation. <br /> • Design footings with a footing extension(projection beyond the base of the <br /> pier)no greater than the footing thickness(Figure 11). Increase footing thick- <br /> ness if necessary. <br /> -- -- Figure 11. Maximum footing <br /> extensions <br /> 4y -6• 16•BLOCK <br /> 4•I I TYPI 24• <br /> FOOTING 18 16• <br /> YES EXTENDS BY ITS NO MORE THAN ITS 24' _ 16^ } O <br /> THICKNESS OR THICKNESS '-- <br /> LESS YES— '45 <br /> k8_ _ <br /> 'J 4• 4' <br /> SPLIT F <br /> YES EXT NDSSPLIT FO EING SS NO EEXTENDSOTING MO E <br /> THAN ONE THIRD THAN ONE THIRD <br /> ITS WIDTH ITS WIDTH <br /> • The footing sizes shown are for square pads and are based on the surface <br /> area(square inches) Design non-square footings such that the area and depth <br /> is equal to or greater than the area of the square footing shown in Table 10 <br /> and the distance from the edge of the pier to the edge of the footing is not <br /> more than the thickness of the footing. <br /> TABLE 10A. FOOTER DEPTH <br /> Poured in Place FootingFooting <br /> ���►ItlrrrSingle Stack Pier ttfii <br /> Double Stack Piere��\�C�P'..1N /4. <br /> Footer Max Fo�ter Footer Max Footer Di <br /> ension Max.Area <br /> Depth Di Max Area Depth mension C1 <br /> 6 28 x 20560 6 28 x 28 784 :C[ ANICU E <br /> 8 32 x 24 768 8 32 x 32 1024 f >♦ :�`j r <br /> 10 36 x 28 1008 10 36 x 36 1296 <br /> 12 40 x 32 1280 12 40 x 40 1600 <br /> 14 44 x 44 1936 �, •�, <br /> 16 48 x 48 2304 /77�t iOF <br /> STEP 6. INSTALL FOOTINGS <br /> Construct the footings as follows: <br /> • Maintain the distance between adjacent piers to within 10%of the tabulated VZ/ <br /> spacing and so the average distance between piers is equal to or less than the Placing Concrete anchors. <br /> tabulated spacing. If anchors will be placed in <br /> • Whenever possible, place pier supports directly under the required locations. If concrete follow instructions <br /> plumbing, electrical or mechanical equipment interferes, place supports no in Install Stabilizing Sys- <br /> more than 6 inches in either direction of the support point. tem(p. 74)to determine <br /> • Recess perimeter pier supports no more than 10 inches from the edge of the anchor layout. Either place <br /> floor with added support as shown in Figure 12. anchors immediately after <br /> the concrete has been <br /> poured or drill them in after <br /> the concrete has set. <br /> 33 <br /> C� <br /> v <br />