My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
620 112TH ST SE SPACE 196 2019-08-16
>
Address Records
>
112TH ST SE
>
620
>
620 112TH ST SE SPACE 196 2019-08-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 8:51:35 AM
Creation date
8/16/2019 8:48:41 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
620
Unit
SPACE 196
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> _. <br /> ��. <br /> ,_ �� -- �,..�_ <br /> ..r.i` ...,,;y... f, ,....�. �+r+ie.'�Pr: ,.�'.'". � . <br /> , ;. 1 <br /> * <br /> �. # �� �. � � � �: <br /> '• <br /> ,. '. <br /> _�- i .w � ,� .y ' " <br /> 467 Swan A�e � Hohenwald,TN 3��b2 • �8�}U) 28�'7�37 • www.oliv�rtechnologies.com • Fax (931� 74C-8811 <br /> Installation Instr�uc�ti�ans for 114Q "`V" 5eries Ail Steel Foun+dation System <br /> SPECIAL CIRCUMSTANCES; !f follc►wlag candiflons ocaur-S'COPI Gontact Oliver Technoingies at 1-800-28d-7437 for further InstructlPns: <br /> a) Pier(system)height exceads 48" b) Fto�f�,�ve�exceed 16" c) Roof pitch greater than 7/12 d) Location is within 1500 fi�et ofi coastltne <br /> e) Sofl conditions less than 48 fj 7hick�n@ wide 1 Beam attachments are available. <br /> INSTALLATION OF GROUND PAM FOR DIRT SET (IV) ' <br /> 1) Remove weeds and debris in an approximate three foot square to expose firm,level undisturbed soil or controiled fill tor each ground pan,7he <br /> 1100 V Pan is equivalent to a 21 x 21 footing. Top nf ground pan(C)must be installed at ground level or per IoCal jurisdiction. <br /> 2) Piace center ground pan(C)diractly below chassis I-beam. Press or dnve pan completely(nto soil until flush with or below sail. <br /> SPECIAL N07E: The langitudinal"V"hrace syscem serves as a pier under the home and shouid be loeded as any other pier.It is recommendad thet <br /> after feveling piers,and ane-hal#inch(1/2"j before hpme is Ioweted campletely onto pie�rs,complete items 3 tfirough 7 beiaw. <br /> IN5TAl.LAfiION AF LQNGITUDINAI."'V"BRAGE SYST`EM ier hei ht at su nrt locatinn. <br /> 3) 5elect the correct square tube brace(E}tangth for set-uP(p� l A pp <br /> PIER NE#GHT 1.5" <br /> (i4pprox.40-60 dagrees Ma}c:� Tube L.ength <br /> �..........r....��.. ....�...�..___ <br /> .. 2C#» -------^-- _.___ � <br /> 'I4"t0 18"---- Q 75" <br /> �$����ia�a �_.e. �� � . <br /> ����,�� ��p --�- <br /> 30°to 40" ,�" <br /> 36°tcr d$" 54' Part E <br /> PiER HEI�ti7=ifre dlmension from the top af tha pan /. <br /> w the bottom at the 1-eaam 8/16"Dia. (.562")hole�.�f 0<?5 <br /> 4) Install bolh of the 1.5"squere tubes{Ej into the"V°bracket(J},insert carriage boit and Isave nut loose for final adjusiment. <br /> 5) Place t-beam connector(F)toasety on fhe bottorr�8ange of the!-beam. <br /> 6) Attach the selected 1.5"tubes(E)ta the i-beam connectors(F)and fasten loosely with boits and nuts. NOTE: The ground pan must be lavel in <br /> both directions to ensure the angle markings on the center point connector ere correct from the horizontal plane nf the pan. The angle is not to <br /> exceed 60 degrees and not less than 40 degrees. The°V"bracket(J)is stamped with the angies to verify correct degree. Use proper 4ength tube <br /> or cut and drili tube to achieve proper Isngth. (The tube may be cut using any appropriate steel cutting method such as steel saw,cutting torch, <br /> etc. New holes must be dhlled to the dimension and at the locatlon as shown far part(E). <br /> 7) Using standard hand toois,tighten ali nuts and holts. When connecting the brace tube to the modei 1100-10-P I-beam connector bracket,tighten <br /> at least one and a half to two full turns past hand tight. <br /> INSTALLA710M dF(LATERAL)TELESCOPING TRANSVERSE AitM SYSTEM(11001TV) <br /> S) Select the correct transverse�rm{Hj.The 6t1"sections sre standard.The 72"sectlons are used qn frame widths greater than 98,5". <br /> 9) InstaA the 1.5"transverse brace(H)to the ground pan connector(D)with the bolt and nut. <br /> 10) Slide 1.25'transverse brace inta the 1.5'brace and attach to adjacent I-beam connector(I)w(th boit and nut. <br /> 11) 5ecure 1.5"transverse arm to i.25°ttansverse arm using four(4)1/4°-14 x 3/4°self-tapping screws in pre-drilled pilo t holes, <br /> INS7ALLATICIN [�StNG GUI��RETE {I�V� <br /> 7he cancrete foofer;rt�nner or siab m�y�ae caf any shape,fhat has a minimum af 2900 cu.in.,with a minimum depfh af�.5"(dry se#}or 6'(�ret s��)>at <br /> each system lacation.The surface of the f�soting shall be I�r9�����+9h to support the pier load and allaw at leest d'ftom the cancrete ba�t tc+the ed9e <br /> of the concre#e(te.22"�c22"x6"f4oter}.'�"he c�sncr�#e shall be a m(ntmum of 2506 psi mix(pre-blended sacked concrste mix is accepfable�.�pa�i�i <br /> inspection of toating is not requ9r�d.if the i 9{141TC tr�nsverse sys#em;(D(W ar p)bracket only)is kn be"rnsCaBed withaut the use csf the iit}0 tl.�E�l <br /> iongitudin�i sysiem{J(W or D) br��icet},it�r1U aT be in�#alted within i8°of pier. <br /> NOTE. 1'he b�rttorn of�Il#ootings,pads,sEabs arad eunners must be per local jursidiation. <br /> LONGITUOINAL(Vj <br /> When using the 11�G we#sei J(W)bracket,simpCy inatiatl the brackat ir�runner/footer QR when installing in cured concrste,use the 11OQ d�'Y set J{D) <br /> bracket.The 11QQ dry set J(Dj bracket is attachsd fn the cancrete using(2)112"X 3"conorete wedge bolts.Piace the brackei in desired Icscation.Mark <br /> bolt hole locations,then using a 112"mas�nry bit,drill a hafe ta a minimum depth of 3".Be sure all dust is blown aut�f the holes.i'lace wedge bofts into <br /> drilled hnles,then place 1100 J(Dj bracket onto wedge boits and start wedge boit nuts.7ake a hammer and lightly drive the wedga bolts dawn by hitting <br /> the nut(Do not hit the top of threads on boit}.Complete by tightening the nuts. <br /> LATEEtAL(7ransverse Arm) <br /> For wet set instal(ation set the transverse connector brackef 0(W)into runner/footer at desired location.For dry set irtsta(tations,fhe transverse connector <br /> bracket D(D)is attached to the concrete using(2)1f2°X 3"concrete wedge bolts.Mark bolt hole locations,then using a 1/2'masonry bit,drill a hole to a <br /> minimum depth of 3'.Be su�e ali dust is blown out of the holes.Pl�ae wedga bolts into drilied holes,then piace transverse connector bracket J(D)bracket <br /> onto wedge bolts and start wedge boft nuts.Take a hammer and lightiy drive the wedge bolts down by hitting the nut{Do not hit the top of threads on <br /> bolt.)Complete by tighksning the nuts. <br /> Revlsed o1.t.t i PATEtVT#6634250 and other patents pending age z I3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.