Laserfiche WebLink
eINSPECTION REPORT <br /> llw-,,i_,?.,,,,,,b Date q ). Permit: E.:).11a 0(03 <br /> Contractor: VA, \ tf4 'I <br /> ( -7 Owner: I A <br /> 1 -- I �IO`_ vi , loute,_ c30-- <br /> ......._ <br /> Site Address: 1P),0 b I D 0 P). "51 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Fi Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ['Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: ___ <br /> � s -b -- - - lel �--- - _---- <br /> APPROVAL ❑ PARTIAL APP'OVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED 111❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> k £/J 4 C^ g(4 !ice <br /> 7-77.2) <br /> Inspector: ' Date: �/�6/6" <br /> EIR(10/06) r DATABA ,INC. <br />