Laserfiche WebLink
.1 Page 1 of 1 <br /> A.Zari&Associates, Inc. Field <br /> Geotechnical Engineering•Environmental Engineering Report NO.:09617121DFR9302017Iv <br /> Construction Testing and Inspection <br /> DATE: 9/30/2017 Set Count: CONTRACTOR: WALSH Construction <br /> PROJECT#: 09617121 PERMIT#: <br /> PROJECT: Trailside Village INSPECTOR: Itiaj vahora <br /> LOCATION: 1300 100th Place SE JURISDICTION: Everett <br /> KA P.M.: Jeff Mercer WEATHER: Cloudy TEMP:60°F <br /> On site per request for adhesive anchor inspection at building #1310, units 13 & 14. Contractor drilled holes <br /> into existing foot lab to expand one foot of footing under'SOf in the bathroom areas per detail 18/S4.00. <br /> Verifiedhole depth and monitor cleaning of hole with compressed air and wire brush. Two#5 rebar with 4 %2" <br /> embedment anchor were installed using AT-XP epoxy with current expiration date. <br /> Work performed per approved plans and details. Total FOUR anchors used. <br /> Pf <br /> CA:27 <br /> Reviewed By: ASTM Test#: Asset Number(s): <br /> To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> • <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519 •Poulsbo (360) 598-2126 • Tacoma(253) 939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Krazan&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accep 02 <br /> responsibility for validity of results.The same information has been provided by others on site. <br />