Laserfiche WebLink
INSPECTION REPORT`'N" _f."°rrv► <br /> %' 1 Date `U I `J Permit: 6 La O ` Out <br /> to <br /> Contractor: WGJ�- Y G <br /> Rb____V_??4_(19i) <br /> Owner: IV AI tag:6 VII & °I-111 <br /> Site Address: )(20 1 L 1, . P\ SE <br /> - •F INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ■ FER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVA ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FO' .C.O. ❑ CORRECTION REQUESTED 111• O '"•R ❑ VIOLATION <br /> r.,2 IN TO PERFORM INSPECTION: <br /> LL(425)257-888kOR REINSPECTION—24 hour otice required <br /> o <br /> Ara r ElaY).... .....---- 1014rt•-t- e--4,1Z) <br /> 1 Date: c `�, <br /> Inspector: De <br /> EIR(10/06) DATABAR,INC. <br />