Laserfiche WebLink
INSPECTION REPORT <br /> Date I tb `� Permit: 6\16\ -43k0-1 <br /> 7�T� <br /> ? Contractor: �(\\,\�,� €\€ c_.,\c_.,2 l Owner: vC 0:1evs <br /> Site Address: \ D \,C)' "\- ` : <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> III Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Groundwork ❑Footing ❑Rough In ❑Rough In, <br /> Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> al :.ugh In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> If •.ervice ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SI WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final EI <br /> EIGas Pipe Final ❑HWT Final <br /> `'t � <br /> OTHER OR CONSULTATION: va) r uip51 <br /> 12•APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> Aor OK FOR T.C.O. ❑ CORRECTION REQUESTED I:=1❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION 24 hour notice required <br /> ex, rie j, / -::=11t;..--= ..' <br /> ,eop1 41 <br /> cuaa <br /> Inspector: <br /> ?I/111P, <br /> Date: S/�/ f 7 <br /> EIR(10/06) DATABAR,INC. <br />