Laserfiche WebLink
. x <br /> INSPECTION REPORT <br /> Date C d05118_ Permit: E18 <br /> 10-200/ �s <br /> Contractor: BOSCapt,tric, <br /> ice . <br /> . " Owner: TCbh-r1, 31a 4aiu— f Thr. <br /> Site Address: 719 ,, LOO S <br /> YPE OF INSPECTION REQUESTED <br /> ELECTRICAL BU DING MECHANICAL PLUMBING <br /> ❑Temp Service ❑ A FER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork al Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit PA Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In a Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> S TE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final �j ❑Gas Pipe Final ❑HWT Final <br /> 7_ <br /> OTHER OR CON LTATION: __- =-5- Jut7-1*RO _-- <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.o. ❑ CORRECTION REQUESTED I=1❑ OK FOR C.O ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425) 057-8881 FOR REINSPECTION-24 hour notice required <br /> Ud)2-©i---- •K'S)P e---Ejr: _ <br /> Inspector: Date: AP ( 4 <br /> EIR(10/06) DATABAR,INC. <br />