My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 112TH ST SW 2019-09-25
>
Address Records
>
112TH ST SW
>
1019
>
1019 112TH ST SW 2019-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 11:30:39 AM
Creation date
8/20/2019 11:59:56 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1019
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Health Center <br /> Other Hard Surfaces feasibility description: <br /> 1. Full Dispersion per BMP T5.30 <br /> i. Full Dispersion is infeasible due to lack of native forest vegetation. <br /> 2. Permeable Pavement per BMP T5.15 <br /> i. Due to the quality and depth of observed on-site soils,permeable the <br /> pavement BMP has been selected to manage new parking area runoff. <br /> Minimum Requirement # 6: Runoff Treatment <br /> Due to the project proposing less than 5,000 sf. new pollution generating hard surfaces <br /> (PGHS) and less than % acre new pollution generating pervious surfaces (PGPS),runoff <br /> treatment is not required. <br /> Minimum Requirement # 7: Flow Control <br /> Due to the project proposing less than 5,000 sf. new hardscape,less than 3/ acres <br /> vegetation to lawn conversion, and less than 2.5 acres native vegetation to pasture <br /> conversion, flow control is not required. <br /> ) <br /> Site Summary <br /> Total Property Area = 138,800 sf. (3.186 Ac.) <br /> Existing Site <br /> On-Site Hardscape area: <br /> Existing CHC Building = 15,600 sf. <br /> Existing asphalt parking lot =49,500 sf. <br /> Total = 65,100 sf. (1.494 Ac.) <br /> On-Site Vegetated area: <br /> Existing Landscaping = 39,500 sf. (0.907 Ac.) <br /> Existing Native Vegetation =34,200 sf. (0.785 Ac.) <br /> Proposed Site <br /> On-Site Hardscape area: <br /> Existing CHC Building = 15,600 sf. <br /> Existing asphalt parking lot =49,500 sf. <br /> Proposed Permeable Pavement = 4,510 sf. <br /> Total = 69,610 sf. (1.598 Ac.) <br /> On-Site Vegetated area: <br /> Existing Landscaping = 32,140 sf. (0.738 Ac.) <br /> Existing Native Vegetation =33,650 sf. (0.772 Ac.) <br /> Proposed Amended Landscaping = 3,400 sf. (0.078 Ac.) <br />• <br /> WESTERN ENGINEERS,INC. 12 PROJECT:17-1688-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.