My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 112TH ST SW 2019-09-25
>
Address Records
>
112TH ST SW
>
1019
>
1019 112TH ST SW 2019-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 11:30:39 AM
Creation date
8/20/2019 11:59:56 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1019
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION FOUR <br /> AMENDMENT OPTIONS <br /> Select the soil preparation options that best suit each area of the project site. <br /> Either choose a pre-approved default amendment rate, or have a qualified professional <br /> calculate a custom rate based on soil and amendment tests described in Section 5, <br /> using the calculation method described in Section 7 "Resources"). <br /> ) <br /> OPTION 1: Leave native vegetation and soil undisturbed, <br /> and protect from compaction during construction. <br /> Identify areas of the site that will not be stripped,logged,graded or driven on,and fence off those areas to prevent impacts <br /> during construction.If neither soils nor vegetation are disturbed,these areas do not require amendment. <br /> OPTION 2: Amend existing site topsoil or subsoil. <br /> either at default "pre-approved" rates, or at custom calculated rates based <br /> on specifier's tests of the soil and amendment. <br /> i <br /> Scarification. Scarify or till subgrade to 8 inches depth(or to depth needed to achieve a total depth of 12 inches of <br /> uncompacted soil after calculated amount of amendment is added).Entire surface should be disturbed by scarification.Do not <br /> scarify within drip line of existing trees to be retained. Amend soil to meet required organic content. <br /> A. Planting Beds B. Turf Areas <br /> 1. PRE-APPROVED RATE:Place 3 inches of 1. PRE-APPROVED RATE:Place 1.75 inches of <br /> composted material and rototill into 5 inches of composted material and rototill into 6.25 inches <br /> soil(a total amended depth of about 9.5 inches, of soil(a total amended depth of about 9.5 inches, <br /> for a settled depth of 8 inches). for a settled depth of 8 inches). <br /> 2. CALCULATED RATE:Place calculated amount 2. CALCULATED RATE:Place calculated amount <br /> of composted material or approved organic of composted material or approved organic <br /> material and rototill into depth of soil needed to material and rototill into depth of soil needed to <br /> achieve 8 inches of settled soil at 10%organic achieve 8 inches of settled soil at 5%organic <br /> content. content. <br /> Rake beds to smooth and remove surface rocks larger than Water or roll to compact to 85%of maximum dry density. <br /> 2 inches diameter.• Rake to level,and remove surface woody debris and rocks <br /> Mulch planting beds with 2 inches of organic mulch. larger than 1 inch diameter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.