My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 112TH ST SW 2019-09-25
>
Address Records
>
112TH ST SW
>
1019
>
1019 112TH ST SW 2019-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 11:30:39 AM
Creation date
8/20/2019 11:59:56 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1019
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Health Center <br /> PHASE CONSTRUCTION ACTIVITYlv <br /> No planned phased construction is expected. it Op <br /> 9. CONSTRUCTION SCHEDULE CO <br /> BMP implementation schedule listed below is keyed to proposed phases of the <br /> construction project, and reflects differences in BMP installations and inspections that <br /> relate to wet and dry season construction. As such, the dry season is considered to be from <br /> May 1 to September 30 and the wet season is considered to be from October 1 to April 30. <br /> • Estimate of Construction start date: 05 /01 /2018 <br /> ■ Estimate of Construction finish date: 06/ 15 /2018 <br /> ■ Mobilize equipment on site: 05 /01 /2018 <br /> • Clear Vegetation From Site 05 /05 /2018 <br /> ■ Re-grade site for Improvements 05 /08 /2018 <br /> • Install Permeable Pavement 05 / 15 /2018 <br /> ■ Complete Site Stabilization 06/ 15 /2018 <br /> 10. FINANCIAL/OWNERSHIP AND RESPONSIBILITIES <br /> Current Owner(s): <br /> Community Health Center <br /> 1019 112th Street SW <br /> Everett,WA 98204 <br /> Bonds and Financial Responsibility <br /> Prior to issuance of the grading, the owner/developer is required to establish the <br /> necessary erosion control and drainage bonding with Snohomish County. Along with <br /> that, the permits will require establishing general liability insurance from the <br /> proposed contractor. <br /> 11. ENGINEERING CALCULATIONS <br /> Sediment Pond/Trap <br /> N/A <br /> Diversions <br /> No diversions are needed for this project <br /> Waterways <br /> Construction on site will not have any effect on adjacent waterways. <br /> JOB NO:17-1688-A 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.