Laserfiche WebLink
Community Health Center <br /> PHASE CONSTRUCTION ACTIVITYlv <br /> No planned phased construction is expected. it Op <br /> 9. CONSTRUCTION SCHEDULE CO <br /> BMP implementation schedule listed below is keyed to proposed phases of the <br /> construction project, and reflects differences in BMP installations and inspections that <br /> relate to wet and dry season construction. As such, the dry season is considered to be from <br /> May 1 to September 30 and the wet season is considered to be from October 1 to April 30. <br /> • Estimate of Construction start date: 05 /01 /2018 <br /> ■ Estimate of Construction finish date: 06/ 15 /2018 <br /> ■ Mobilize equipment on site: 05 /01 /2018 <br /> • Clear Vegetation From Site 05 /05 /2018 <br /> ■ Re-grade site for Improvements 05 /08 /2018 <br /> • Install Permeable Pavement 05 / 15 /2018 <br /> ■ Complete Site Stabilization 06/ 15 /2018 <br /> 10. FINANCIAL/OWNERSHIP AND RESPONSIBILITIES <br /> Current Owner(s): <br /> Community Health Center <br /> 1019 112th Street SW <br /> Everett,WA 98204 <br /> Bonds and Financial Responsibility <br /> Prior to issuance of the grading, the owner/developer is required to establish the <br /> necessary erosion control and drainage bonding with Snohomish County. Along with <br /> that, the permits will require establishing general liability insurance from the <br /> proposed contractor. <br /> 11. ENGINEERING CALCULATIONS <br /> Sediment Pond/Trap <br /> N/A <br /> Diversions <br /> No diversions are needed for this project <br /> Waterways <br /> Construction on site will not have any effect on adjacent waterways. <br /> JOB NO:17-1688-A 4 <br />