Laserfiche WebLink
,TELS Page 1 of 2 <br /> Print Pale I 1E Close Window <br /> LOGBOOK DOCUMENTATION <br /> Everett Care and Rehabilitation Center 1067- Everett, s , <br /> WA 98204-3784 <br /> Emergency Power Generators: Test generator under SWIRLY <br /> ` <br /> load, perform routine checks, create entry in logbook. <br /> Marked done on-time by Barry Kriewald on July 31, <br /> 2018. <br /> Serial# Building Location Make& Model Description <br /> 2016683 Main Building Back of Building Generac 86583 Emergency Power Generator-94A051065 <br /> Date Completed: 7/31/2018 <br /> Start Time: 1:55 PM <br /> End Time: 2:27 PM <br /> Hour Meter Reading (Start): 483.0 hours <br /> Hour Meter Reading (End): 483,5 hours <br /> Transfer Time to Emergency Power: 4 seconds <br /> Load Run Time: 30 minutes <br /> Cool Down Time: 2 minutes <br /> Load: 80 % <br /> Fuel Level or Percentage: 67% <br /> Beginning Engine Oil Pressure: 65 psi <br /> Ending Engine Oil Pressure: 65 psi <br /> Ending Water Temperature: 176 F <br /> Voltage Output: 120/208 V <br /> Amperage Output: 120 amps <br /> Amperage Output- Phase 2: 120 amps <br /> Amperage Output- Phase 3: 90 amps <br /> Hertz/Cycles: 60.4 Hz <br /> kW Rating: 100 kW <br /> Is there 90 minute battery powered lighting at generator and transfer?: Yes <br /> Transfer Switch Functional?: Yes <br /> Specific Battery Gravity Checked: Pass <br /> Specific Battery Gravity Levels: • 26.2 VDC <br /> Prestart Checklist Completed (see task instructions): Yes <br /> https://www.tels.net/TELS/Schedule/TaskPopup.aspx?TaskInstancelD=59994504&ItemOr... 8/13/2018 <br />