Laserfiche WebLink
TELS <br /> ( Page 1 of <br /> -2) <br /> Print Page I al Close Window <br /> LOGBOOK DOCUMENTATION <br /> Everett Care and Rehabilitation Center 1067 - Everett, <br /> WA 98204-3784 , <br /> Emergency Power Generators: Test generator under SUPPtir <br /> load, perform routine checks, create entry in logbook. <br /> Marked done on-time by Barry Kriewald on March 29, <br /> 2018. <br /> Serial# Building Location Make& Model Description <br /> 2016683 Main Building Back of Building Generac 86583 Emergency Power Generator-94A051065 <br /> Date Completed: 3/29/2018 <br /> Start Time: 12:15 PM <br /> End Time: 12:47 PM <br /> Hour Meter Reading (Start): 472.0 hours <br /> Hour Meter Reading (End): 472.6 hours <br /> Transfer Time to Emergency Power: 4 seconds <br /> Load Run Time: 30 minutes <br /> Cool Down Time: 2 minutes <br /> Load: 80 % <br /> Fuel Level or Percentage: 85% <br /> Beginning Engine Oil Pressure: 75 psi <br /> Ending Engine Oil Pressure: 75 psi <br /> Ending Water Temperature: 174 F <br /> Voltage Output: .120/208 V <br /> Amperage Output: 90 amps <br /> Amperage Output- Phase 2: 100 amps <br /> Amperage Output Phase 3:. 110 amps <br /> Hertz/Cycles: 60 Hz <br /> kW Rating: 100 kW <br /> Is there 90 minute battery powered lighting at generator and transfer?: Yes <br /> Transfer Switch Functional?: Yes <br /> Specific Battery Gravity Checked: Pass <br /> Specific Battery Gravity Levels: 24 VDC <br /> Prestart Checklist Completed (see task instructions): Yes <br /> https://www.tels.net/TELS/Schedule/TaskPopup.aspx?TaskInstancelD=56714575&ItemOr... 8/13/2018 <br />