My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1919 112TH ST SW 2019-08-20
>
Address Records
>
112TH ST SW
>
1919
>
1919 112TH ST SW 2019-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 1:41:52 PM
Creation date
8/20/2019 1:25:26 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1919
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELS Page 1 of 2 <br /> Li Print Page I NJ Close Window <br /> LOGBOOK DOCUMENTATION <br /> Everett Care and Rehabilitation Center 1067-Everett, • <br /> WA 98204-3784 x' ,. �» <br /> Emergency Power Generators: Test generator under s <br /> load, perform routine checks, create entry in logbook. ,� <br /> Marked done on-time by Barry Kriewald on August 28, <br /> s. <br /> 2017. <br /> Serial# Building Location Make& Model Description <br /> 2016683 Main Building Back of Building Generac 86583 Emergency Power Generator-94A051065 <br /> Date Completed: 8/28/2017 <br /> Start Time: 11:45 AM <br /> End Time: 12:17 PM <br /> Hour Meter Reading (Start): 453.0 hours <br /> Hour Meter Reading (End): 453.5 hours <br /> Transfer Time to Emergency Power: 4 seconds <br /> Load Run Time: 30 minutes <br /> Cool Down Time: 2 minutes <br /> Load: 80 % <br /> Fuel Level or Percentage: 49% <br /> Beginning Engine Oil Pressure: 70 psi <br /> Ending Engine Oil Pressure: • 70 psi <br /> Ending Water Temperature: 175 F <br /> Voltage Output: 120/208 V <br /> Amperage Output: 110 amps <br /> Amperage Output- Phase 2: 120 amps <br /> Amperage Output- Phase 3: 120 amps <br /> Hertz/Cycles: 60.3 Hz <br /> kW Rating: 100 kW <br /> Is there 90 minute battery powered lighting at generator and transfer?: Yes <br /> Transfer Switch Functional?: Yes <br /> Specific Battery Gravity Checked: Yes <br /> Prestart Checklist Completed (see task instructions): Yes <br /> Are the battery cables free of corrosion?: Yes <br /> https://www.tels.net/TELS/Schedule/TaskPopup.aspx?TaskInstancelD=51155411&ItemOr... 8/13/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.