My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1715 127TH PL SE 2019-08-20
>
Address Records
>
127TH PL SE
>
1715
>
1715 127TH PL SE 2019-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 2:28:39 PM
Creation date
8/20/2019 2:28:38 PM
Metadata
Fields
Template:
Address Document
Street Name
127TH PL SE
Street Number
1715
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Project Information <br /> Property Owner Name: Pilon, Pamela <br /> Project Address: 1715 127th PI SE Parcel# 28053000403800 <br /> City: Everett State: Wa ZIP: 98208 <br /> Day Phone: <br /> Contractor Name Offset Solar LLC <br /> Contractor License#: offsesl831p1 10/13/19 <br /> Contractor Day Phone: 858-243-8909 <br /> PV system description Itek Energy iT295-SE <br /> (include manufacturer System Size: 12.00 <br /> and model#of PV Inverter(s): Solar Edge Technologies Inc. SE7600H-US <br /> modules and Modules: 40 <br /> inverters): Valuation: 12720 <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ❑ <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] X] ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to 0 <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended ❑ <br /> by WA State. [IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per ❑ <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)] ly 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] X 0 <br /> Enter total dead load of system(lbs/ft2): 2.5 <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed.[IRC M2302.2.1(4)] 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.