Laserfiche WebLink
e:, INSPECTION REPORT <br /> Dat g7/J7____ Permit: _6-/-706:1-05c1 <br /> IO <br /> /,:- Contractor: ! a �''- <br /> jF.M- (1 Owner: r �: tr` �': 5. <br /> Site Address: .,� � id5'fr. ®( <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> lab/Conduit El Foundation El Ceiling Grid 11 Ceiling Grid <br /> ough In ❑Structural Slab ❑OK tot insulate ❑OK to insulate <br /> Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid Drywall Nailing Plumbing Final <br /> [DI=1 ❑]Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL • ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. • ❑ CORRECTION REQUESTED <br /> 11] OK OK FOR C.O. ❑ VIOLATION <br /> 4ABLE TO PERFORM INSPECTION: Ale) - <br /> El CALL(425)257-8881 FOR REINSPECTION—24 hour notice req ired <br /> , ,", <br /> Inspector: / Date: 7/0 7/I///7 <br /> EIR(10/06) �� DATA INC. <br />