Laserfiche WebLink
INSPECTION REPORT <br /> Date ) _ Permit: 1 n ( 0 <br /> ' <br /> Contractor: \I -b <br /> tANNIAPI*6 <br /> 1iceOwner: 1AJAvI <br /> , i' )1N)' <br /> (P2V <br /> Site A.. -ss: 52� ) '1 gr.. Ss i 4-(b1 ii <br /> TYPE OF INSPECTION REQUESTED g {vi <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains pouilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> A APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> i.OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> FOR C.O. ❑ VIOLATION El- <br /> ❑ UNABLE TO PERFORM INSPECTION: __— — <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> AL2. p/4:;Q – <br /> Inspector: c7.) F: Date:r'Z 7-- /7 <br /> EIR(10/06) DATABAR,INC. <br />