My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 4/1/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
KPFF Consulting Engineers 4/1/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 11:37:07 AM
Creation date
8/21/2019 11:37:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
4/1/2016
Council Approval Date
3/23/2016
End Date
12/31/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design Supplemental
Tracking Number
0001969
Total Compensation
$0.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> r■M► <br /> Washington State <br /> Department of Transportation <br /> Supplemental Agreement Organization and Address <br /> KPFF Consulting Engineers <br /> Number 5 1601 Fifth Avenue, Suite 1600 <br /> Seattle,WA 98101 <br /> Original Agreement Number <br /> 3588 Phone: (206) 622-5822 <br /> Project Number Execution Date Completion Date <br /> 12/22/14 12/31/17 <br /> Project Title New Maximum Amount Payable <br /> Grand Avenue Park(Utility and Pedestrian)Bridge $ 1,749,965.87 <br /> Description of Work <br /> Continued design,permitting, and engineering services for the Grand Avenue Park(Utility and Pedestrian) <br /> Bridge for the City of Everett.Phases include services on the Utility Bridge(Phase 1A),Pedestrian Upgrades <br /> (Phase 1B), and West Marine View Drive Utilities (Phase 2). <br /> The Local Agency of City of Everett <br /> desires to supplement the agreement entered into with KPFF Consulting Engineers <br /> and executed on 12/22/14 and identified as Agreement No. 3588 <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br /> The changes to the agreement are described as follows: <br /> Section 1, SCOPE OF WORK, is hereby changed to read: <br /> No additional scope of work. <br /> I I <br /> Section IV, TIME FOR BEGINNING AND COMPLEJION, is amended to change the number of calendar days for <br /> completion of the work to read: 12/31/17 <br /> III <br /> Section V, PAYMENT, shall be amended as follows: <br /> No change to the maximum amount payable; it remains as $1,749,965.87. <br /> as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces <br /> below and return to this office for final action. <br /> By: ,Y,PFF Consulting Engineers By. City of Everett <br /> apiAl-/r'5 I ,°%fl4--s4/f 0/44 .1 / <br /> Consultant Signature Apprtt ing Authority Signature <br /> p � Date <br /> DOT Form 140-063 EF AT 7 <br /> Revised 9/2005 <br /> City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.