My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Agency A&E Professional Services <br /> Cost Plus Fixed Fee Consultant Agreement <br /> Agreement Number: 3588 <br /> Firm/Organization Legal Name(do not use dba's): <br /> KPFF Inc. (dba KPFF Consulting Engineers) <br /> Address Remit to Address <br /> 1601 Fifth Avenue, Suite 1600, Seattle, WA 98101 Same <br /> UBI Number Federal TIN or SSN Number <br /> 578-063-612 91-0755897 <br /> Execution Date Completion Date <br /> March 31, 2016 <br /> 1099 Form Required Federal Participation <br /> 0 Yes ❑ No ❑ Yes El No <br /> Description of Work <br /> Engineering and permitting services for the City of Everett Grand Avenue Park(Utility and Pedestrian) Bridge, <br /> to include plans, specifications,and Engineer's Construction Cost Estimate. The Grand Avenue Park Bridge has <br /> two key purposes. The first is to provide a connection between critical combined sewer improvements with <br /> outfalls on the shoreline of Puget Sound. The Burlington Northern Santa Fe(BNSF)railroad tracks and State <br /> Route 529 (West Marine View Drive) stand as barriers between the Grand Avenue Park and Puget Sound <br /> requiring a grade separated crossing to complete the connection. In addition to providing the utility connection, <br /> the structure's second role will be to function as a pedestrian bridge between Grand Avenue Park and the <br /> waterfront. <br /> ❑ Yes 0 No DBE Participation Total Amount Authorized: $1,649,965.87 <br /> ❑ Yes ❑1 No MBE Participation Management Reserve Fund: $100,000.00 <br /> ❑ Yes El No WBE Participation <br /> Maximum Amount Payable: $1,749,965.87 <br /> ❑ Yes 0 No SBE Participation <br /> Index of Exhibits <br /> Exhibit A Scope of Work <br /> Exhibit B DBE Participation <br /> Exhibit C Preparation and Delivery of Electronic Engineering and Other Data <br /> Exhibit D Prime Consultant Cost Computations <br /> Exhibit E Sub-consultant Cost Computations <br /> Exhibit F Title VI Assurances <br /> Exhibit G Certification Documents <br /> Exhibit H Liability Insurance Increase <br /> Exhibit I Alleged Consultant Design Error Procedures <br /> Exhibit J Consultant Claim Procedures <br /> Agreement Number: 3588 <br /> Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 1 of 14 <br /> Revised 10/30/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.