Laserfiche WebLink
EXHIBIT E (5) <br /> Sparling <br /> g <br /> 7 ..,, ... ::.✓Fa,/;,. .,<z. r,��/�Hs.,.�, ��u,,, ��� <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE <br /> Classification Total Hours X Rate = Cost <br /> Electrical Prince•�" �;' ' <br /> 0.00 X $210.00 = $0.00 <br /> Staff Level 2 - 0.00 X $195.00 = $0.00 <br /> Staff Level 4 (Project Manager) 93.00 X $170.00 = $15,810.00 <br /> Staff Level 6 (Engineer) 100.00 X $142.00 = $14,200.00 <br /> CADD Drafting 60.00 X $95.00 = $5,700.00 <br /> Document Production/Admin 0.00 X $85.00 = $0.00 <br /> Principal Lighting Design II (Can( 39.00 X $175.00 = $6,825.00 <br /> Lighting Designer C4 27.00 X $140.00 = $3,780.00 <br /> DSC Subtotal $46,315.00 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 0.00% X $46,315.00 = $0.00 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 0.00% X $46,315.00 = $0.00 <br /> Reimbursables <br /> Mileage (## Miles x $0. . ' r e <br /> Reprographics (## Sheets x $X.xxlsheet '� <br /> Subcontract (Sub Name & Task) <br /> (Blank) (Allowance) <br /> Subtotal $0.00 <br /> Subconsultant Total: $46,315.00 <br /> Date: 11/20/2014 <br />