Laserfiche WebLink
Hour Summary KPFF Consulting Engineers <br /> • COST ESTIMATE: GRAND AVENUE PARK BRIDGE <br /> November 19.2014 Sperling SPARLING <br /> I Start Staff Prinopal <br /> GRAND AV E N U E PARK BRIDGE EripaeeLevel ggPPncil Level 2 Levelff (Enga Dring II Designer MULTIPLIER: <br /> item SCOPE OF WORK $210.00 $195.00 $170.00 $142.00'. $95.00 $89.00 I 4115.00 1 $140.00 1.0000 <br /> PHASE 1B -PEDESTRIAN UPGRADES <br /> 13 PROJECT MANAGEMENT&ADMS 1 A1ION(KPFF&LMN n, <br /> a . <br /> Labor Subtotal: 0 0 0 • 0 0 0 '1 0 0 $0 <br /> Labor subtotal: 0 • • 0 0 0 • 0 0 $0 <br /> Reimbursables' <br /> Labor Subtotal: 0 0 0 0 0 0 I • $ $0 <br /> Labor Subtotal: 0 0 0 0 0 s 0 0 0 ���$6 <br /> Labor Subtotal: 0 0 •�✓ 0 0 0 0 0..: $0 <br /> 18.1 30 Percent PSE � <br /> Identifyto be Relocated —..:: $23T <br /> Import Base Files hem Client 1 1 <br /> Set up Schematic Drawings 1 1 1 $4 q <br /> Site Inspeetton <br /> ,;r' <br /> Contact Utility Providers <br /> Identify Electrical Elements *BO Identify Lighting Elements 4 2 ..f$B0 <br /> Client Review Meeting 2 4 <br /> 18.2 80 Percent PSE , <br /> Update 60%DD Base Files IV1 1 .'' $407„ ;:. <br /> Set up 60%DO Electrical Drawings 1 l 1 1 <br /> 60%Design <br /> Lighting Product Selection and Cut Sheets ✓7, 3 3 $41145 <br /> Lighting Calculations 2 4 $910 <br /> Set up 60%DD Lighting Drawings 2 2 2 $820 <br /> Design PUD Electrical Conduit 8 Vault System <br /> Design Can Conduit 8 Vault System 2 1 2 j 1 $719 <br /> 60%Drawings <br /> ba r <br /> Electrical/Com Site Drawings . a II 2 I 2 1 $719 <br /> Lighting Site Drawings I JY �t 2 4 4 44,„ $1,450 <br /> Bridge Electrical Drawings 2 2 2 $814 <br /> Bridge Lighting Drawings 2 4 4 01.450 <br /> Site Electrical 8 Conduit Details 2 1 r'.:. $379 <br /> Bridge Conduit Details 2 1 4,979 <br /> Electrical Loads 1 2 ' <br /> One Lines 1 2 1 ; <br /> Coordinate Electrical Service Applicaf/on 2 4 1 "' <br /> Client/Owner Review Meeting 2 4 $t 046 <br /> Specifications 1 1 $312 <br /> Cost Estimate 1 1 f <br /> 18.3 90 Percent PSE <br /> Update 90%CD Base Files 1 1 I- <br /> I 7. "4237 <br /> Conduit and Junction Box Design 2 1, 2 I, 4 $624 <br /> 90%Design ; ✓ <br /> Coordinate with Civil and Uaity Platy 1 1 1 i $407 <br /> Circuiting Design 2 I 2 , $624 <br /> Voltage Drop Calculatlaw 2 Il $284 <br /> 90%Drawingsa <br /> Bridge Electrical Drawings 2 �2� I 2. �. r„ C $814 <br /> Bridge Lighting Drawings 2 2 4 $1,100 <br /> Site Electrical 8 Conduit Details 1 1 1 $e4(r0�1� <br /> Bridge Conduit Details 1 1 1 1 I ,T" <br /> Parol Schedules , <br /> One Lines 2 2 1� $074 <br /> Coordinate Electrical Service Application 2 2 2 I I $$14 <br /> ClientOwner Review Meeting 2 4 $1,040 <br /> Submit Coordination Plans to Utilities <br /> Specifications 1 1II 12 <br /> Cost Estimate 1 1 I I j2 <br /> 18.4 100 Percent(Final)PSE ' <br /> Update 100%CD Base Files 1 1 1 1 $Q31 <br /> Coordinate with CMI and Utility Plans I <br /> Finalize Drawings <br /> Finalize Bridge Lighting Drawings 2 4 2 4 $6010 <br /> Finalize Bridge Electrical Drawings 2 2 2 III $914 <br /> Finalize Bridge Lighting Details 2 2 2 $820 <br /> Finalize Site Electrical&Conduit Details 2 I 2 I 1 $119 <br /> FMalize Bridge Conduit Details 2 If 2 14 <br /> $119 <br /> Final Specifications 1 1 ,$312 <br /> Final Cost Estimate 1 1 r .,,i 4312 <br /> Labor Subtotal: 0 0 U $1 30 0 35 27 $27,917 <br /> 19 <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 $0 <br /> Labor Subtotal: 0 0 0 0 0 0 0 0 T $0 <br /> Labor Subtotal: 0 0 0 0 0 • I • 0 $0 <br /> Reimbursabies: <br /> Pedestrian Bridge Labor Sum: 0 00®MIE00 27 $27,917 <br /> Pedestrian Bridge Reimbursable Sum: $0 <br /> Pedestrian Bridge Subtotal: SPARLING .;_ $ .'," '"=RIDGE SUBTOTAL: $27,917 <br /> • <br /> Phase 1 Labor Sum(Utility 8 Pedestrian Bridge): 0 0 93 1100 60 0 39 27 $46,315 <br /> Phase 1 Reimbursable Sum(Utility&Pedestrian Bridge): c "'"""" "'"" ' by <br /> PHASE 1 SUBTOTAL $46,315 <br />