My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hour Summary KPFF Consulting Engineers <br /> COST ESTIMATE: GRAND AVENUE PARK BRIDGE <br /> The GreenBusch Grou.,Inc. minzmisni <br /> GRAND AVENUE PARK BRIDGE Pr nn pe imager <br /> Designer CADTech CAD i Tech CAD Tech <br /> finer Deaigner�Designer Designed ',once" <br /> Charge MULTIPLIER: <br /> ITEM SCOPE OF WORK 1124101231 $37.00 $35.00 lanillIEMINEMail $28.00 11.3031111321:211 MEM.. <br /> PHASE 2 - WEST MARINE VIEW DRIVE UTILITIES <br /> Labor Subtotal: 0 0 0 0 0 0 : 0 000INIEMM <br /> Relmbursables: <br /> Labor Subtotal:00 0 : 0 0 0 0 000 <br /> Reimbursables: <br /> 1.z: :143k12Cet <br /> Labor Subtotal:0 0 0 0 0 0 0 0000 <br /> ibialbutioables: <br /> :i�)E34Tl4:ZPi#.77R•P71.73ri'iw ..i1 '[c jt:I7:1 <br /> Labor Subtotal:00 0 0 0 0 0 0000 <br /> `t01`itadrke.' :i„ f,,, ',,, ,✓ i <br /> OFTME 1;1.7-ra%4.3:7N:1tt3.7111114;1:1:1M2tir•.71.73-1te rOViIaImo' <br /> 00 11111:111111MILIMIIMENIN/ <br /> MM. 0 0 0 0 0 M. 00 <br /> MEM <br /> Reimbursabktaz <br /> Phase 2-Utilities North of Brid•e Labor Sum: 0 0 0 0 0 0 0 0 0 0 $0 <br /> Phase 2-Utilities North of Brid.a Reimbursable Sum:; $0 <br /> Phase 2-Utilities North of Bridge Subtotal: GREENBUSCHUTILITITES N.OF BRIDGE SUBTOTAL: $0 <br /> Labor Sum(Phases 1 and 2): 20 27 122 112 113 0 162 100 0 I 98 $57,931 <br /> Reimbursable Sum(Phases 1 AND 2): $483 <br /> TOTAL(PHASES 1 AND 2): GREENBUSCR)TAL(UTILITY&PEDESTRIAN): $58,413 <br /> Date 11/19/2014 Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.