Laserfiche WebLink
EXHIBIT E (8) <br /> " res <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE <br /> Classification Total Hours X Rate = Cost <br /> Senior Principal 25.00 X _ $1,400.00 <br /> Principal 94.00 X $52.00 = $4,888.00 <br /> Project Manager 24.00 X � $33.00 = $792.00 <br /> Senior Designer 58.00 X $28.50 = $1,653.00 <br /> Designer 0.00 X $20.50 = $0.00 <br /> Adminstration 20.00 X ti $25.00 = $500.00 <br /> DSC Subtotal $9,233.00 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of //04,47444,1,14y, W< X $9,233.00 = $11,241.18 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $9,233.00 = $2,769.90 <br /> Reimbursables <br /> MileL (XXX Miles x $0.5: """=:% N", <br /> Reprographics (Lump Sum) <br /> Technology Charges (Lump Sum) <br /> e:: (Allowance) <br /> Subtotal $0.00 <br /> Subconsultant Total: $23,244.08 <br /> Date: 11/20/2014 <br />