Laserfiche WebLink
GRAND AVENUE PARK 1 <br /> BRIDGE DESIGN COSTS KPFF LMN I HWA LANDAU SWIFT SPARLING 'GREEN-BUSCH HDR TW TOTAL <br /> PHASE 1 - UTILITY AND PEDESTRIAN BRIDGE <br /> I <br /> PHASE 1A-UTILITY BRIDGE $ 460,524.03 $ 192,886.72 $ 130,958.64 I $ 43,099.06 $ 74,941.81 $ 18,398.00 $ - $ 21,598.35 $ - $ 942,406.62 <br /> 1 <br /> PHASE 1B-PEDESTRIAN UPGRADES $ 74,220.18 $ 97,187.36 $ - I $ - $ 61,708.08 $ 27,917.00 $ 58,413.31 $ - $ 23,244.08 $ 342,690.01 <br /> PHASE 1 SUBTOTAL: $ 534,744.21 $290,074.08 $ 130,958.64 $ 43,099.06 $ 136,649.89 $ 46,315.00 $ 58,413.31 I $ 21,598.35 $ 23,244.08 $ 1,285,096.62 <br /> PHASE 2- WEST MARINE VIEW DRIVE UTILITIES <br /> PHASE 2 SUBTOTAL: $166,411.92 $0.00 $51,009.93 $50,829.36 $35,439.32 $0.00 $0.00 $61,178.71 $0.00 $364,869.25 <br /> MANAGEMENT RESERVE <br /> MANAGEMENT RESERVE SUBTOTAL: TBD TBD TBD TBD TBD TBD TBD TBD TBD $100,000.00 <br /> PHASE 1 AND 2 GRAND TOTAL $701,156.13 $290,074.08 ; $181,968.57 $93,928.42 $172,089.21 $46,315.00 j $58,413.31 $82,777.06 I $23,244.08 $1,749,965.87 <br />