Laserfiche WebLink
Hour Summary KPFF Consulting Engineer <br /> COST ESTIMATE:GRAND AVENUE PARK BRIDGE <br /> November 20,2014 KPFF Consulting Engineer KPFF <br /> GRAND AVENUE PARK BRIDGE Ted, Project senor Darin GADO Coordinator Land survey Project Survey EtaId Survey <br /> Specialist Manager Engineer Engineer Technician 1 Admin Manager Surveyor Crew Drafter <br /> MULTIPLIER: <br /> Item SCOPE OF WORN $62.50 $54.60 $45.00 $35.40 $3923 $28.85 $40.39 $32.00 $50,00 $20.00 2.6659 <br /> PHASE 1B-PEDESTRIAN UPGRADES <br /> 13 PROJECT MANAGEMENT i ADMINISTRATION(KPFF&LMNI ,,, <br /> 13.1 Pro act Schedule _ _ <br /> 19.2 Das•n Team A•reementa2 4 $599 <br /> 13.3 Progress Reports 4 4 —... 5890 <br /> 13.4 Invoices 4 4 <br /> 13.5 '"Team Meetings 8 8 <br /> tabor Subtotal: $ 15 0 0 0 12 0 0 0 1 0 $6078 <br /> Relmbursables: SO <br /> 14.1 Basis of Dealg1 4 0.5 e <br /> ean -,. <br /> 14.2 Bridge Design <br /> 14.3 T • ,Size i Location Study <br /> __ Dreg TS&L Report 36 1 5 <br /> Final TS&L Report 1 4 1 7 <br /> 14.4 Final PSE Design <br /> 3015 Deis ngn 6 58 60 2 Y %" <br /> 60%Down 6 68 140 2 .o, <br /> _ - .. _ ,__ <br /> Desr4. <br /> 90%Design 6 38 54 2 :+ <br /> 100%(Fa <br /> n _.. 2-----' __. 14 28 2 <br /> (Falai) <br /> &d Support _ — — — 4 -- - -- 4,, i,:a <br /> Labor Subtotal: 25 1 0 188 0 282 11 0 0 0 0 $55,017 <br /> Reimbursables: $0 <br /> Mail IM31.1.13.1 $5 <br /> Reimbursables: $0 <br /> a r., <br /> 0 0 0 <br /> 0 0 0 0 0 0 0 $5 __ <br /> Reimbursables: $0 <br /> Reimbursable, v <br /> --0 $0 <br /> Reimbursables: $0 <br /> MMEINANI4 I I i MMIMMil $0 <br /> Reimbursables: $0 <br /> 20.1 Meetings with BNSF 2 2 <br /> 20.2 Identify and Coordinate Right of Entry Approval <br /> 20.3 1ConstructIon and Maintenance Agreement 2 2 .,: it ti..—_. — —. _. .... , <br /> 20.4 Coordinate with CI ,WUTC and BNSF 2 2WWII" <br /> 20.5 1BNSf Review&Approval of Dulgns <br /> Conceptual Design 4 4 2 '_. _ _ 105 j,",j, <br /> 30%Des'. 4 4 2 'j,.] :. <br /> 700%Design 4 4 2 <br /> Labor Subtotal: 8 1$ 0 0 12 S 0 0 0 1 0 $5,• <br /> Reimbursables: $0 <br /> S,..1- •act Research and Data Gathering— _._ SEMISSEM <br /> �Sta 3-Basis of Desi n and Alternative 8cn Ng_Panmetm <br /> Step 3-Cross Agency Partnership WorkS� _... 2 <br /> .__8 j • <br /> _.. Step rt_Alternative Development Manin <br /> Step 5-Cross Agency Perbtxthip Workshop and Public Outreach 2 8 I --_ <br /> 5-AlWnatlw Refinement T <br /> Sb 7-CrossA➢Agency Workshop and Public Outreach 2 8 X,.098 <br /> 1 --- <br /> Step 5-Preferred Albmaliw Selection 2 6 11,498Labor Subtotal: 5 32 0 0 <br /> -- 0 0 0 0 0 0 $5,991 <br /> Reimbursables: br477:1,,, S <br /> Pedestrian Bridge Labor Sum:alrial 88 198 0 204 29 0 0 0 0 $74,220 <br /> Pedestrian Brid,e Reimbursable Sum: $0 <br /> Pedestrian Bridge Subtotal: .',x ; e ITEC ' a`+ *'',i./.47.LIE411111MErta <br /> Phase 1 Labor Sum(Utility 3 Pedestrian Bridge): 289 762 1140 572 1217 178 48 58 72 52 I $513,264 <br /> Phase 1 Reimbursable Sum(Utility&Pedestrian Bridge): lG_v° %", `,;�'`; ", °"ti " „” ""'` m°""" "e,. °d.,..;'"$z: $21,480 <br /> PHASE 1 SUBTOTAL: ,,' ',„ $534,744 <br /> Date:11/20/2014 Page 3 of 4 <br />