Laserfiche WebLink
EXHIBIT E (1) <br /> LMN Architects <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE <br /> Classification Total Hours X Rate = Cost <br /> Partner 86.00 X $81 .73 = $7,028.78 <br /> Project Manager 189.00 X $32.69 = $6,178.41 <br /> Project Designer 552.00 X $48.08 = $26,540.16 <br /> Project Architect 712.00 X $33.65 = $23,958.80 <br /> Intern 876.00 X $28.85 = $25,272.60 <br /> Specs 0.00 X $43.27 = $0.00 <br /> QA/QC 40.00 X $43.27 = $1,730.80 <br /> DSC Subtotal $90,709.55 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 185.00% X $90,709.55 = $167,812.67 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $90,709.55 = $27,212.87 <br /> Reimbursables <br /> Mileage (600 Miles x $0.565/mile) $339.00 <br /> Reprographics (Lump Sum) $1,000.00 <br /> Model Site Context and Bridge $3,000.00 <br /> Subtotal $4,339.00 <br /> Subconsultant Total: $290,074.08 <br /> Date: 11/20/2014 <br />