Laserfiche WebLink
EXHIBIT E (2) <br /> HWA GeoSciences Inc. <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE <br /> Classification Total Hours X Rate = Cost <br /> Principle IX 21.00 X $72.00 = $1,512.00 <br /> Principle VIII 20.00 X $72.00 = $1,440.00 <br /> Geotechnical Engineer VI 30.00 X $48.08 = $1,442.40 <br /> Geotechnical Engineer IV 430.00 X $45.67 = $19,638.10 <br /> Geotechnical Engineer I 404.00 X $25.48 = $10,293.92 <br /> Geologist V 94.00 X $31.39 = $2,950.66 <br /> Hydro geologist IV 24.00 X $34.62 = $830.88 <br /> Geologist I 10.00 X $23.32 = $233.20 <br /> CAD 24.00 X $22.07 = $529.68 <br /> Clerical 11.00 X $20.82 = $229.02 <br /> DSC Subtotal $39,099.86 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 175.00% X $39,099.86 = $68,424.76 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $39,099.86 = $11,729.96 <br /> Reimbursables <br /> Mileage (400 Miles x $0.565/mile) $ 224.00 <br /> Drilling Subcontractor Holocene Drilling $ 28,170.00 <br /> Drilling Subcontractor Geologic Drilling $ 5,000.00 <br /> BNSF Flagger BNSF $ 2,000.00 <br /> Laboratory Testing HWA GeoSciences Lab $ 10,700.00 <br /> Groundwater Transducers Purchased for the Project $ 2,200.00 <br /> Traffic Control Equipment Rented for Project $ 1,100.00 <br /> )ptional Drilling Subcontractor Holocene Drilling $ 3,000.00 <br /> )ptional Drilling Subcontractor Geologic Drill $ 6,000.00 <br /> Optional Traffic Control Equipment Rented for Project $ 1,000.00 <br /> Optional Lab Testing HWA GeoSciences Lab $ 3,320.00 <br /> Subtotal $62,714.00 <br /> Subconsultant Total: $181,968.57 <br /> Date: 11/20/2014 <br />