Laserfiche WebLink
P-2 <br />P-3 <br />P-4 <br />P-5 <br />P-8 <br />P-6 <br />P-7 <br />P-12 <br />Label <br />I-1 <br />I-2 <br />I-3 <br />I-4 <br />I-5 <br />Outlet <br />J-1 <br />J-2 <br />J-4 <br />I-9 <br />Elapsed <br />38 <br />35 <br />43 <br />30 <br />25 <br />53 <br />50 <br />5 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />00 <br />Discharge � <br />0.26 <br />0.06 <br />0.10 <br />0.04 <br />0.07 <br />0.56 <br />0.41 <br />0.51 <br />0.57 <br />0.06 <br />ninute(s) 7 <br />4 <br />4 <br />6 <br />4 <br />8 <br />8 <br />4 <br />inch <br />inch <br />inch <br />inch <br />inch <br />inch <br />inch <br />inch <br />Ground <br />198.44 <br />200.00 <br />199.00 <br />199.00 <br />200.00 <br />198.21 <br />199.90 <br />199.00 <br />199.00 <br />199.00 <br />second(s) <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />10 <br />06 <br />41 <br />04 <br />57 <br />51 <br />07 <br />06 <br />Elevations <br />Upstream HGL <br />197.01 <br />196.86 <br />197.90 <br />196.62 <br />196.15 <br />195.50 <br />196.70 <br />196.28 <br />195.78 <br />196.28 <br />197. <br />196. <br />196. <br />196. <br />195. <br />196. <br />196. <br />196. <br />90 <br />86 <br />70 <br />62 <br />78 <br />28 <br />15 <br />28 <br />196.70 <br />196.70 <br />196.28 <br />196.28 <br />195.50 <br />195.78 <br />195.78 <br />196.28 <br />---------------- <br />� Downstream HGL <br />197.01 <br />196.86 <br />197.90 <br />196.62 <br />196.15 <br />195.50 <br />196.70 <br />196.28 <br />195.78 <br />196.28 <br />Project Title: Slerley Qevelopment -#12 Everett Mall Way ProJect Engineer. Rick Heide, P.E. <br />untitled.stm Design Build Sarvices, Inc. StormCAD v1.0 <br />OBI79/97 043820 PM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 7551666 Page 2 of 2 <br />