Laserfiche WebLink
i <br />� <br />� <br />TYPE OR PRINT ONLY <br />STERLEY DUANE <br />Application For <br />PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />32�0 Cedar Street <br />Evere��, WA 98201 259-8810 <br />��1 POSTING APR t 3 1998 <br />14824 w <br />Mailing Address <br />RD STANWOOD <br />� <br />oate 9/11/97 <br />Public Works Permit k 1�/�' � <br />euilding Permit k 56485 _ <br />.o <br />Public Works Fee $ � <br />City Zip Phone <br />APOLLO SPAS <br />Applicant Mailing Address City Zip Phone � <br />Describe Proposed Work <br />PROJECT ADDRESS (if known) <br />NEW RETAIL/SHOWROOM BUILDING <br />Attach four (4) copies of plans for proposed work - Draw to sca�e and note fhe following if applicable: <br />•Property Lines •Outline and dimensions of all existing and proposed siructures on the lot •Existing and proposed utilities <br />•Centerline of street •Indicate North •Show any proposed greding changes •Show measurements <br />PERMIT CONDITIONS: <br />1. Ail calls for inspection shall be made 24 hours in aavance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current Ciry of Everett Design and <br />Construction Siandards and Specifications. <br />3. Cali Locat�on Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. <br />�� �l s Pt� .� P�rv�cd � I�r� da �ed 1 o�8�q7 . <br />10-13-97 3:e^EPM <br />4f 56485 <br />EUIL� 833.75 <br />SRCHG 4.50 <br />H 97312 <br />W <br />� <br />� <br />V♦ <br />� <br />O <br />� <br />� <br />� <br />a <br />ACKNO W LEDGEMEN�6 @�N DITIONS <br />;7 / / The undersigned owner,(appt�Dliereb�e9�s to hold and save harmless <br />� ��� �� the City of Everett from �d all claimg.(oF�magas, costs, expenses, or <br />causes of action th3t m becaus2'lSf 1S tallation and maintenance of <br />ih ' ntor ther g�l��-wa u`�li+al�appliediorandfurtheragrees <br />� eimproveme o y <br />a��n to remove same upon notice (rom ihe City and to�jQblic�Q6 <br />(� •�a� 3—l7— 9$ damaged thereby. A OM�430 <br />FINAL INSPECTION Date <br />Approved as Constructed <br />Signature of Applicant Date <br />WOPK AUTHORIZED BY THIS PER611T MUST BE STARTED WITHIN 780 DAYS OF �ATE PERMIT IS ISSUED AND hIEREAFfER IS TO BE DILIGENTLY PURSUED TO <br />COMPLEfION. THIS PERMIT MAY BE CANCELLED 8Y THE CITY IIPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />