My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3701-19
>
Ordinances
>
Ordinance 3701-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 4:31:45 PM
Creation date
9/30/2019 4:31:44 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3701-19
Date
9/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LI <br /> EVERETT <br /> WASHINGTON <br /> ORDINANCE NO. 3701-19 <br /> AN ORDINANCE creating a special improvement project entitled, "Citywide Safety Flashing Yellow Arrow <br /> Improvements" Fund 303, Program 116,to accumulate all costs for the improvement. <br /> WHEREAS, <br /> A. The City of Everett is committed to a planned pedestrian safety program; and <br /> B. The City of Everett has identified the need and obtained funds to construct certain pedestrian <br /> safety improvements; and <br /> NOW,THEREFORE,THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. A special improvement project is hereby established as Fund 303, Program 116, entitled <br /> "Citywide Safety Flashing Yellow Arrow Improvements" to accumulate all costs for the improvement. <br /> Section 2. Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 116,for the improvement project. <br /> Section 3. Authorization is hereby granted for the "Public Works Director" or"City Engineer," under <br /> direction of the Mayor,to assume full and complete responsibility for conducting all tasks and doing all <br /> things to accomplish the actions authorized in this ordinance. <br /> Section 4. The sum of$760,400 is hereby appropriated to Fund 303, Program 116, "Citywide Safety <br /> Flashing Yellow Arrow Improvements" as follows: <br /> A. Estimated Project Costs <br /> Design and Construction $760,400 <br /> Total Estimated Cost $ 760,400 <br /> B. Source of Funds <br /> City Safety—Federal Funds $ 660,400 <br /> Fund 119—Street Improvements 100,000 <br /> Total Estimated Funds $ 760,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.