My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1917/08/17 Council Minutes
>
Council Minutes
>
1917/08/17 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:47:57 PM
Creation date
9/25/2020 3:22:50 PM
Metadata
Fields
Template:
Council Minutes
Date
8/17/1917
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The regular Adminietrative Sea Cion of the <br /> City Council was held August 17th,1417 at'Ee:30 4.41. <br /> with Mayor Merrill in the Chair and Ccamlesionere Merrill, <br />, sally and Clay present at roll Call. <br /> On motion minutes approved ae of se Coro. <br /> Moved by Clay,wounded by Kelly that the <br /> comendation <br /> following ie of the Supervising Engineer be <br /> d hereby i authorised: <br /> 1.Build special trestle across Mood.Lake <br /> treek in place of buried crossing as planned. <br /> 2.Build timber bulkheads for proteotion of <br /> pipe where neceeeary. <br /> E.Clear and burn such elaahinge in the Sul- <br /> tan Canyonse the Supervising Engineer may direct,also <br /> remove dangerous stumps and boulaere. <br /> 4.Make epeclal provision for admission of <br /> water.of Babecker Creek to pipe line for emergency service <br /> 5.Place special concrete protiction at <br /> South portal of Tunnel#2 and build bypaee chamber neer <br /> ..backer Creek. <br /> 6.Build timber protection at portals of <br /> fennel#1. <br /> 7.Place additional concrete for protection <br /> of pipe near intake and for security of diversion Cam as <br /> a.ay be noes ea,. <br /> S..Perform wohk of protection Of pipe fres .4 <br /> elide in vicinity of Station 12 and at such other places <br /> 1n the canyon ae necessity may develop. ".1 <br /> 8.Su11d protection work over pipe for de- <br /> flection of boulaere dna elides where neceeeary. <br /> 30.Build'truss span over Chaplain Creek. <br />
The URL can be used to link to this page
Your browser does not support the video tag.